W9127S-24-F-6009: $1.6M Department of the Army Award to Burns & McDonnell Engineering Company, Inc
Ebbing f35 group ops building ae requirement. clin 0001 is through 35% design, clin 0002 is through 100% design, clin 0003 is support during construction contract solicitation, and clin 0004 is support during construction. Contracting activity: W076 ENDIST LITTLE ROCK. Estimated completion: 2030-09-30.
$1.6M total obligated / $1.9M ceiling / Competed / 2030-09-30 completion / W9127S W076 ENDIST LITTLE ROCK
1. Contract Summary & Primary Sources
| Contract Number (PIID) | W9127S-24-F-6009 (unhyphenated: W9127S24F6009) / Parent Vehicle: W9126G-23-D-0005 |
|---|---|
| Prime Contractor (Awardee) |
Burns & McDonnell Engineering Company, Inc
(Arkansas)
FY2024-FY2026 Federal Defense Portfolio: $395.1M obligated across 360 contracts
|
| Total Obligated (all actions) | $1,599,154 ($1.6M) |
| Ceiling (maximum contract value) | USAspending base and all options: $1,857,392 |
| USAspending / FPDS Obligation History | Total obligated: $1,599,154 (signed 2024-09-06, latest FPDS action 2026-02-27) / 10 Issued Delivery/Task Order(s) totaling $46,024,665 |
| Awarding Branch / Agency | Department of the Army |
| Contracting Command & DoDAAC | W9127S: W076 ENDIST LITTLE ROCK |
| Competition & Contract Structure | Competed / Delivery Order (delivery order) / Firm-Fixed-Price (FFP) |
| Product / Service & Industry Codes | PSC C219 (Architect And Engineering- General: Other) / NAICS 541330 (Engineering Services) |
| Work Locations & Funding | Primary Place of Performance: Arkansas |
| Estimated Completion Date | 2030-09-30 |
| Verified Primary Sources |
2. Verbatim Announcement & Scope Breakdown
Ebbing f35 group ops building ae requirement. clin 0001 is through 35% design, clin 0002 is through 100% design, clin 0003 is support during construction contract solicitation, and clin 0004 is support during construction
3. Subcontractor, Supply Chain & Capture Intelligence
Subcontracting & Material Supply Window
- Prime Awardee: Burns & McDonnell Engineering Company, Inc
- Delivery Runway: Active through 2030-09-30
- Requirement Scope: Ebbing f35 group ops building ae requirement. clin 0001 is through 35% design, clin 0002 is through 100% design, clin 0003 is support during construction contract solicitation, and clin 0004 is support during construction
- Federal Supply Class: PSC C219 (Architect And Engineering- General: Other)
- BD Action: Reference Prime Contract W9127S-24-F-6009 when contacting Burns & McDonnell Engineering Company, Inc Supply Chain / Small Business Liaison Officer.
Buying Command & Recompete Posture
- Buying Command: W9127S (W076 ENDIST LITTLE ROCK)
- Acquisition Method: Competed
- FOIA Jurisdiction: Army Contracting Command (ACC) FOIA Officer (usarmy.redstone.acc.mbx.hqaccfoia@army.mil)
- Capture Action: Request Section B CLIN ceiling structure and Section C Statement of Work below to benchmark deliverable requirements.
Issued Task & Delivery Orders under W9127S-24-F-6009 (10 shown, $46.0M obligated)
| Order PIID | Obligated | Awardee | Start / Latest Action | End Date | Order Scope |
|---|---|---|---|---|---|
| W9127S25F6005 | $12.7M | Burns & McDonnell Engineering Company, Inc | 2025-01-22 / 2026-03-30 | 2026-05-15 | Architect-engineering services for f35 academic training center and mission ops ebbing angb - complete thru 35% design phase services. |
| W912BV25F0049 | $7.1M | Burns & McDonnell Engineering Company, Inc | 2025-02-21 / 2026-05-21 | 2026-11-22 | F35 republic of singapore air force 3-bay hangar design project at ebbing air national guard base, fort smith, arkansas. |
| W912BV24F0308 | $5.3M | Burns & McDonnell Engineering Company, Inc | 2024-09-27 / 2026-03-18 | 2026-12-27 | 35%, 65%, 95%, and 100% design packages for the integrated capability depot oxygen facility, tinker air force base, oklahoma. |
| W9126G25FA151 | $4.9M | Burns & McDonnell Engineering Company, Inc | 2025-09-27 / 2025-09-27 | 2029-03-18 | The government will utilize the deliverables from this task order to develop a dbb (site adapt) of the military working dog (mwd) kennels in san antonio, tx three kennel facilities, providing a total of 400 dog-runs, and one kennel support ... |
| W9127S24F0007 | $4.5M | Burns & McDonnell Engineering Company, Inc | 2023-12-21 / 2025-01-15 | 2027-03-22 | Design a two story F-35 building |
| W912BV24F0070 | $4.1M | Burns & McDonnell Engineering Company, Inc | 2024-05-24 / 2026-01-13 | 2028-03-28 | Fy27 ifpc/m-shorad instructional facility design |
| W9126G25F0141 | $3.2M | Burns & McDonnell Engineering Company, Inc | 2025-04-09 / 2025-04-09 | 2025-08-29 | A-e services for 35% design and level 3 cost estimate. rsi matoc task order rfp for jbsa-lackland military working dog kennel-chapman annex training. |
| W9126G25F0122 | $2.2M | Burns & McDonnell Engineering Company, Inc | 2025-04-08 / 2025-09-22 | 2025-10-20 | Architect and engineer services for 35% design and level 3 cost estimate. rsi matoc task order rfp for lackland west military working dog kennel. |
| W9126G24F0373 | $2.1M | Burns & McDonnell Engineering Company, Inc | 2024-09-23 / 2025-10-09 | 2026-03-22 | Architect-engineer services required for preparation to complete a 100% design-bid-build (d-b-b) request for proposal (rfp) package of b6413 hangar first and second floor renovation at barksdale air force base (afb), bossier city, la. |
| W9126G23F0388 | -$3K | Burns & McDonnell Engineering Company, Inc | 2023-09-27 / 2025-08-27 | 2024-09-19 | A-e military min guarantee |
Recent Contract Actions from Buying Office W9127S (W076 ENDIST LITTLE ROCK)
| Date | Contract (PIID) | Prime Contractor | Amount | Completion | Scope Summary |
|---|---|---|---|---|---|
| 2026-08-19 | W9127S-22-D-0026 | Great Lakes Dredge & Dock | $12.3M | Aug 20, 2027 | Great Lakes Dredge & Dock gets $12.3M modification for long-term capability, station dredging on the McClellan-Kerr Arkansas River Navigatio... |
| 2026-08-03 | W9127S-26-C-A009 | BL Harbert International | $37.6M | Jan 31, 2029 | BL Harbert International wins $37.6M contract for an F-35 Special Access Program Facility. U.S. Army Corps of Engineers $37.6M obligated now... |
| 2026-04-07 | W9127S-26-C-A006 | BL Harbert International | $40.9M | Mar 23, 2028 | BL Harbert International wins $40.9M contract for construction of an approximately 25,000-square-foot. U.S. Army Corps of Engineers $40.9M o... |
| 2025-12-11 | W9127S-26-C-A001 | BL Harbert International | $61.4M | Mar 21, 2028 | BL Harbert International wins $61.4M contract for F-35 program, supporting multiple countries simultaneously. U.S. Army Corps of Engineers $... |
| 2025-11-13 | W9127S-26-C-A002 | Red Eagle 3 JV of Coweta | $22.9M | Nov 23, 2027 | Red Eagle 3 JV of Coweta wins $22.9M contract for design-build services for the Pine Bluff Arsenal Waterline Replacement. U.S. Army Corps of... |
| 2025-09-08 | W9127S-25-D-A004 | Olgoonik General | $45.0M | Sep 7, 2030 | Olgoonik General wins $45.0M contract for various minor construction projects. U.S. Army Corps of Engineers work through Sep 7, 2030. |
Other Recent Department of War Awards to Burns & McDonnell Engineering Company, Inc
| Date | Contract (PIID) | Branch | Amount | Completion | Scope Summary |
|---|---|---|---|---|---|
| 2025-12-31 | W912DQ-26-D-A011 | Army | $49.0M | Dec 30, 2030 | Burns & McDonnell Engineering wins $49.0M contract for planning, design, construction, and operation services. U.S. Army Corps of Engineers ... |
4. Underlying Contract Files (Section B Pricing & Section C Statement of Work)
Pre-Filled FOIA Request Letter for W9127S-24-F-6009
Routed to Army Contracting Command (ACC) FOIA Officer (usarmy.redstone.acc.mbx.hqaccfoia@army.mil) / Official Agency FOIA Portal ↗
Export Contract Dossier & Related Awards
Download this contract record, sibling orders, and buying office awards in CSV, JSON, or Markdown Brief, or query via the AwardTape API & MCP server.
Building an AI agent? Get this award as JSON: GET /api/agent/v1/awards?q=W9127S24F6009. Schema, sample and price or start with free sample calls.