AwardTape · Defense awards · Construction · Architect-engineering services · W9123821D0003
W9123821D0003: $0 IDIQ contract to HDR Gei Joint Venture
HDR Gei Joint Venture holds an IDIQ contract from Department of the Army with $0 obligated since Oct 2023, against a ceiling of $110.0M. Latest action Aug 26, 2024.
Architect engineer civil works, dam safety and levee safety program design services in support of united states ARMY corps of engineers south pacific division wide. (years 1, 2 and 3)
| PIID | W9123821D0003 |
|---|---|
| Type | IDIQ contract |
| Company | HDR Gei Joint Venture |
| Agency | Department of the Army |
| Contracting office | W075 ENDIST SACRAMENTO |
| Category | Construction · Architect-engineering services |
| PSC | C219 ARCHITECT AND ENGINEERING- GENERAL: OTHER |
| NAICS | 541330 ENGINEERING SERVICES |
| Obligated since Oct 2023 | $0 |
| Total obligated (lifetime) | $0 |
| Ceiling (base and all options) | $110.0M |
| Base date | Sep 13, 2021 |
| Latest action | Aug 26, 2024 |
| End date | n/a |
| Actions since Oct 2023 | 4 |
| Pricing | Firm fixed price |
| Competition | Full and open competition |
| Source | USAspending.gov record |
| Reporting lag | DoD 90 days |
| Award | Company | Obligated FY2024+ | What | Agency | Category | Latest action |
|---|---|---|---|---|---|---|
| W9123824F0047 delivery order | HDR Gei Joint Venture | $4.6M | Project title and location: programmatic baseline water control manual (wcm) updates for black butte dam, hidden dam, new hogan dam, terminus dam, and merced stream group, ca. | Army | Architect-engineering services | Jul 23, 2024 DoD 90d |
| W9123825F0080 delivery order | HDR Gei Joint Venture | $4.0M | Project title and location: san joaquin river basin, lower san joaquin river, fourteen mile slough closure structure (fm_50l) stockton, ca, fy25 | Army | Architect-engineering services | Apr 16, 2025 DoD 90d |
| W9123824F0004 delivery order | HDR Gei Joint Venture | $3.7M | Project title and location: mitigation design of the urrutia habitat restoration and enhancement project on the lower american river in sacramento, california. | Army | Architect-engineering services | Dec 10, 2025 DoD 90d |
| W9123825FA043 delivery order | HDR Gei Joint Venture | $2.0M | Water control manual (wcm) updates for oroville dam, oroville, ca and new bullards bar dam, dobbins, ca fy25 | Army | Architect-engineering services | May 5, 2026 DoD 90d |
| W9123823F0015 delivery order | HDR Gei Joint Venture | $1.7M | Project title and location: american river common features (arcf) 2016 project, civil and fish passage engineering during construction (edc) services and quality assurance (qa) laboratory testing for sacramento weir widening, yolo county, ... | Army | Architect-engineering services | Oct 9, 2025 DoD 90d |
| W9123824F0002 delivery order | HDR Gei Joint Venture | $1.4M | Project title and location: crossover and run-around tracks, military ocean terminal concord (motco), concord, ca | Army | Architect-engineering services | Apr 21, 2026 DoD 90d |
| W9123822F0004 delivery order | HDR Gei Joint Venture | $532K | Project title and location: american river common features, natomas basin reach a, civil engineering services during construction, sacramento, california | Army | Architect-engineering services | Jun 3, 2026 DoD 90d |
| W9123823F0060 delivery order | HDR Gei Joint Venture | $479K | Project title: preparation of water control manual update management plans for multiple dams truckee river basin reservoirs, nv&ca/pine flat dam&lake (pine flat), kings river, ca/buchanan dam-h.v. eastman lake (buchanan), chowchilla river, ... | Army | Architect-engineering services | Mar 3, 2025 DoD 90d |
| W9123825FA010 delivery order | HDR Gei Joint Venture | $264K | Project title and location: folsom dam raise project, main dam spillway edc, folsom, california | Army | Architect-engineering services | Jan 13, 2026 DoD 90d |
| W912P723F0030 delivery order | HDR Gei Joint Venture | -$25K | Golden gate national cemetery road improvement design | Army | Architect-engineering services | May 12, 2026 DoD 90d |
| W912P722F0005 delivery order | HDR Gei Joint Venture | -$252K | Design of irrigation system for golden gate national cemetery | Army | Architect-engineering services | Mar 31, 2026 DoD 90d |
Source: USAspending.gov prime award data (FPDS), DoD and DHS contracts, orders and IDVs with any action since Oct 1, 2023. Obligated FY2024+ sums the obligations on those actions; total obligated is the award's lifetime figure. DoD contract actions publish on USAspending about 90 days after signing (DFARS PGI 204.6), so the latest DoD actions here trail the calendar by about 3 months. Place of performance shows the state only.
Terminal: alerts on new orders and modifications to this contract, and CSV export.
7 days free for first-time subscribers, then $49/mo. Card required. Cancel before day 8 and you pay nothing.
Start free trial