1. Contract Summary & Primary Sources
| Contract Number (PIID) | W58RGZ-25-C-0001 (unhyphenated: W58RGZ25C0001) |
|---|---|
| Prime Contractor (Awardee) |
Longbow LLC
(Florida)
FY2024-FY2026 Federal Defense Portfolio: $315.5M obligated across 28 contracts
|
| Total Obligated (all actions) | $8,320,000 ($8.3M) |
| USAspending / FPDS Obligation History | Total obligated: $8,320,000 / Obligated FY2024 onward: $198,476,069 (signed 2024-10-11, latest FPDS action 2026-03-03) |
| Awarding Branch / Agency | Department of the Army |
| Contracting Command & DoDAAC | W58RGZ: W6QK ACC-RSA |
| Competition & Contract Structure | Sole-source / Definitive Contract (definitive contract) / Firm-Fixed-Price (FFP) |
| Product / Service & Industry Codes | PSC J016 (Maint/Repair/Rebuild Of Equipment- Aircraft Components And Accessories) / NAICS 336411 (Aircraft Manufacturing) |
| Work Locations & Funding | Primary Place of Performance: Florida |
| Estimated Completion Date | 2030-09-30 |
| Verified Primary Sources |
2. Verbatim Announcement & Scope Breakdown
USAspending / FPDS Transaction Description (Contract W58RGZ25C0001)
Fire control radar (fcr) production
3. Subcontractor, Supply Chain & Capture Intelligence
For Tier-2 / Tier-3 Subcontractors & Suppliers
Subcontracting & Material Supply Window
- Prime Awardee: Longbow LLC
- Delivery Runway: Active through 2030-09-30
- Requirement Scope: Fire control radar (fcr) production
- Federal Supply Class: PSC J016 (Maint/Repair/Rebuild Of Equipment- Aircraft Components And Accessories)
- BD Action: Reference Prime Contract W58RGZ-25-C-0001 when contacting Longbow LLC Supply Chain / Small Business Liaison Officer.
For Competing Primes & Capture Managers
Buying Command & Recompete Posture
- Buying Command: W58RGZ (W6QK ACC-RSA)
- Acquisition Method: Sole-source
- FOIA Jurisdiction: Army Aviation and Missile Command (AMCOM) FOIA Office (usarmy.redstone.amcom.mbx.g6-foia-office@army.mil)
- Capture Action: Request the FAR 6.303 Sole-Source Justification & Approval (J&A) and Section C SOW below to inspect the government's technical rationale and qualify for future orders.
Tier-2 Subcontract Reporting Status (FAR 52.204-10): Prime contractors report first-tier subcontracts of $30,000 or more to the Federal Subaward Reporting System (FSRS) by the end of the month following subcontract award. Under DFARS 252.219-7003, prime awards exceeding $750,000 ($1.5M for construction) carry mandatory small-business subcontracting plans. Component and subsystem suppliers should contact Longbow LLC Supply Chain / Small Business Liaison referencing contract W58RGZ-25-C-0001.
Recent Contract Actions from Buying Office W58RGZ (W6QK ACC-RSA)
| Date | Contract (PIID) | Prime Contractor | Amount | Completion | Scope Summary |
|---|---|---|---|---|---|
| 2026-11-25 | W58RGZ-25-C-0003 | Amentum Services Inc. | $34.4M | Nov 30, 2027 | Contract W58RGZ-25-C-0003# for aviation maintenance services to Combat Aviation Brigades |
| 2026-11-20 | W58RGZ-25-C-0004 | Amentum Services Inc. | $19.9M | Nov 30, 2027 | Global aviation maintenance services |
| 2026-11-19 | W58RGZ-25-C-0003 | Amentum Services Inc. | $18.4M | Nov 30, 2027 | Worldwide aviation maintenance support, including level-of-effort support, pass-back maintenance, and installation of aircraft modifications |
| 2026-11-16 | W58RGZ-25-C-0003 | Amentum Services Inc. | $14.6M | Nov 30, 2027 | Global aviation maintenance services including pass-back maintenance support and level-of-effort support, installation of aircraft modificat... |
| 2026-11-13 | W58RGZ-26-G-0011 | Kraus Hamdani Aerospace Inc. | $14.9M | Dec 30, 2026 | Procure Battalion Reconnaissance Unmanned Aircraft Systems |
| 2026-10-27 | W58RGZ-21-D-0077 | The Boeing Co. | $499.8M | Feb 20, 2031 | Apache AH-64 engineering services and technical support |
| 2026-10-22 | W58RGZ-27-D-A008 | Longbow LLC | $419.6M | Jan 31, 2032 | Fire control radar systems and post-production support services for the Apache Attack Helicopter (AH64D/E) |
| 2026-10-13 | W58RGZ-27-D-A007 | Lockheed Martin | $117.1M | - |
Other Recent Department of War Awards to Longbow LLC
| Date | Contract (PIID) | Branch | Amount | Completion | Scope Summary |
|---|---|---|---|---|---|
| 2026-10-22 | W58RGZ-27-D-A008 | Army | $419.6M | Jan 31, 2032 | Fire control radar systems and post-production support services for the Apache Attack Helicopter (AH64D/E) |
| 2025-12-15 | W58RGZ-22-C-0053 | Army | $11.2M | Dec 31, 2026 | Longbow gets $11.2M modification for sustainment of the Apache AH-64D/E Model Fire Control Radar. Army Contracting Command $11.2M obligated ... |
4. Underlying Contract Files (Section B Pricing & Section C Statement of Work)
Document Status: Not yet on file. The government publishes the award notice and obligation record above, but does not post the underlying Section C Statement of Work (SOW), Section B line-item pricing schedule (CLINs), or Sole-Source Justification & Approval (J&A) online.
Free DIY 5 U.S.C. 552 Generator ($0 Cost)
Pre-Filled FOIA Request Letter for W58RGZ-25-C-0001
Routed to Army Aviation and Missile Command (AMCOM) FOIA Office (usarmy.redstone.amcom.mbx.g6-foia-office@army.mil) / Official Agency FOIA Portal ↗
Optional Anonymous Filing via AwardTape Research: Prefer to keep your company name off the agency's public FOIA log? Enter your work email and AwardTape will track or file this request under AwardTape Research and email you when the agency responds.
Export Contract Dossier & Related Awards
Download this contract record, sibling orders, and buying office awards in CSV, JSON, or Markdown Brief, or query via the AwardTape API & MCP server.
Building an AI agent? Get this award as JSON: GET /api/agent/v1/awards?q=W58RGZ25C0001. Schema, sample and price or start with free sample calls.