Tracked vehiclesAnduril Enterprise 0.87% fill $173.4M / $20BCBP AST 46.50% fill $929.9M / $2.0BPalantir Maven 81.60% fill $637.6M / $781.3MShield AI USCG $61.4M drawn 12 ordersCounter-drone $2.1B drawn 25 C-UAS vehicles and awardsUSAspending compile · Oct 9 2026
AwardTape

AwardTape · Defense awards · Construction · Architect-engineering services · W58D2M24A0003

W58D2M24A0003: $0 blanket purchase agreement to MPC S.r.l

MPC S.r.l holds a blanket purchase agreement from Department of the Army with $0 obligated since Oct 2023, against a ceiling of $250K. Latest action Jan 18, 2024.

Design and construction safety coordination at camp darby, dmc, tirrenia, pisa, italy.

PIIDW58D2M24A0003
Typeblanket purchase agreement
CompanyMPC S.r.l
AgencyDepartment of the Army
Contracting office0414 AQ HQ CONTRACT AUG
CategoryConstruction · Architect-engineering services
PSCC219 ARCHITECT AND ENGINEERING- GENERAL: OTHER
NAICS541330 ENGINEERING SERVICES
Obligated since Oct 2023$0
Total obligated (lifetime)$0
Ceiling (base and all options)$250K
Base dateJan 18, 2024
Latest actionJan 18, 2024
End daten/a
Actions since Oct 20231
PricingSet per order
CompetitionNot reported
SourceUSAspending.gov record
Reporting lagDoD 90 days
Orders under this award38 orders · search
AwardCompanyObligated FY2024+WhatAgencyCategoryLatest action
W912PF26FA044
BPA call
MPC S.r.l$2.5KProject ed-00072-4p construct covered acp structures at gate 4 removing existing tentsArmyArchitect-engineering servicesMar 19, 2026
DoD 90d
W912PF25FA099
BPA call
MPC S.r.l$2.4KDsc and csc for projects ed-00341-8 - fire code compliance b-202, cd3-00214-5j - exterior paint b-202, cd3-00216-5j - repair covered walkway b-202 for casa toscana building 202, camp darby, italy.ArmyArchitect-engineering servicesAug 5, 2025
DoD 90d
W912PF26FA025
BPA call
MPC S.r.l$2.4KSafety coordination regarding project es00071-4p, construct acp structure, gate 27, darby military community, italyArmyArchitect-engineering servicesJan 30, 2026
DoD 90d
W912PF25FA101
BPA call
MPC S.r.l$2.2KLiv design and construction safety coordination for project ls-00274-4p installation of a new vpc inspection tent and project ls-00139-4p vpc area upgrade depot area, darby community, livorno, italyArmyArchitect-engineering servicesAug 28, 2025
DoD 90d
W912PF25FA016
BPA call
MPC S.r.l$2.1KBounty hunter site upgradeArmyArchitect-engineering servicesJan 14, 2025
DoD 90d
W912PF25FA019
BPA call
MPC S.r.l$2.1KDsc and csc of the project es-00161-4p replace heat recovery unit bldg. 5130ArmyArchitect-engineering servicesJan 24, 2025
DoD 90d
W912PF25FA024
BPA call
MPC S.r.l$2.1KChange direction of roof drainage system bldg. 204ArmyArchitect-engineering servicesDec 20, 2024
DoD 90d
W912PF25FA050
BPA call
MPC S.r.l$2.1KDesign and construction safety coordinators for project ed 00212-2 replace hp and ahu bldg. 206ArmyArchitect-engineering servicesMay 8, 2025
DoD 90d
W912PF25FA058
BPA call
MPC S.r.l$2.1KDesign and construction safety coordination for project es 00110-5p install generator bldg. 5155 depot area, darby community, livorno, italyArmyArchitect-engineering servicesJun 6, 2025
DoD 90d
W912PF25FA063
BPA call
MPC S.r.l$2.1KDsc and csc for project ea-00109-4p lps air terminal protection against overturning displacement in the ammunition storage area, camp darby, italy.ArmyArchitect-engineering servicesJun 16, 2025
DoD 90d
W912PF25FA065
BPA call
MPC S.r.l$2.1KDesign safety coordinator (dsc) and construction safety coordinator (csc) for project es-00122-4p replace main sprinkler pipe in building 5881, camp darby, italy.ArmyArchitect-engineering servicesJun 16, 2025
DoD 90d
W912PF25FA070
BPA call
MPC S.r.l$2.1KDesign safety coordinator (dsc) and construction safety coordinator (csc) for project ms-00213-5p certify pulsetech aluminum structure building 5050.ArmyArchitect-engineering servicesJun 18, 2025
DoD 90d
W912PF26FA057
BPA call
MPC S.r.l$2.0KProject pa1-00255-5p network and electrical infrastructure at tombolo dock, camp darby, livorno, italyArmyArchitect-engineering servicesMar 31, 2026
DoD 90d
W912PF26FA079
BPA call
MPC S.r.l$2.0KProject es-00153-5p replace hallway false ceiling and light fixtures b5155ArmyArchitect-engineering servicesApr 29, 2026
DoD 90d
W912PF26FA109
BPA call
MPC S.r.l$2.0KProject ed-00093-5p repair darby public toilet b725ArmyArchitect-engineering servicesMay 18, 2026
DoD 90d
W912PF26FA112
BPA call
MPC S.r.l$2.0KProject ed-00139-6j repair of the camp darby south side emergency roadArmyNew constructionMay 21, 2026
DoD 90d
W912PF24F0026
BPA call
MPC S.r.l$1.9KDesign and construction safety coordination replace boiler bldg. 101ArmyArchitect-engineering servicesMar 1, 2024
DoD 90d
W912PF24F0036
BPA call
MPC S.r.l$1.9KDesign and construction safety coordination project pd1 00204-0p "repair west perimeter road depot".ArmyArchitect-engineering servicesMar 11, 2024
DoD 90d
W912PF24F0057
BPA call
MPC S.r.l$1.9KCsc repair a/c bldg. 925ArmyArchitect-engineering servicesMay 23, 2024
DoD 90d
W912PF25FA039
BPA call
MPC S.r.l$1.7KConstruction safety coordinator (csc) for project #ms-00197-3p- install pulsetech drip system in warehouses bldg 5040, 5070, 5080, 5090, depot area darby community, livorno, italyArmyArchitect-engineering servicesMar 20, 2025
DoD 90d
W912PF24F0146
BPA call
MPC S.r.l$1.5KConstruction safety coordinator for fa-00200-0p, vannini road, darby military community, livorno, italyArmyArchitect-engineering servicesSep 19, 2024
DoD 90d
W912PF25FA025
BPA call
MPC S.r.l$1.5KReplace boiler with heat pump at bldg. 5012ArmyArchitect-engineering servicesJan 10, 2025
DoD 90d
W912PF25FA026
BPA call
MPC S.r.l$1.5KCoordinator (csc) for project # fs-00174-2p, replace two air conditioning (ac) units at bldg. 5012ArmyArchitect-engineering servicesFeb 3, 2025
DoD 90d
W912PF25FA028
BPA call
MPC S.r.l$1.5KConstruction safety coordinator (csc) for project ed-00134-3j upgrade the mixing sink exhaust and ventilation system bldg 5144, depot area, darby community, livorno, italy.ArmyArchitect-engineering servicesFeb 24, 2025
DoD 90d
W912PF25FA042
BPA call
MPC S.r.l$1.5KConstruction safety coordinator (csc) for project #ms-00193-3p- install overhead lifting equipment building 5150, depot area, darby community, livorno, italy.ArmyArchitect-engineering servicesMar 20, 2025
DoD 90d
W912PF25FA061
BPA call
MPC S.r.l$1.5KConstruction safety coordinator (csc) for project ms-00383-1p - repair depo east perimeter roadArmyArchitect-engineering servicesJun 9, 2025
DoD 90d
W912PF25FA066
BPA call
MPC S.r.l$1.5KLiv csc connect bldg. 113 under power generatorArmyArchitect-engineering servicesJun 16, 2025
DoD 90d
W912PF25FA034
BPA call
MPC S.r.l$1.4KLiv csc repair roof building 925ArmyArchitect-engineering servicesMar 5, 2025
DoD 90d
W912PF24F0141
BPA call
MPC S.r.l$1.3KConstruction safety coordinator for w912pf-24-f-0099, deconstruct and reconstruct facility in asa, building 2023, darby military community, italyArmyArchitect-engineering servicesSep 19, 2024
DoD 90d
W912PF24F0143
BPA call
MPC S.r.l$1.3KConstruction safety coordination fire code compliance bldg. 5050ArmyArchitect-engineering servicesSep 20, 2024
DoD 90d
W912PF24F0145
BPA call
MPC S.r.l$1.3KConstruction safety coordinator for project aa1-00150-2p, demolish and reconstruct facility in asa, building 2022ArmyArchitect-engineering servicesSep 19, 2024
DoD 90d
W912PF24F0062
BPA call
MPC S.r.l$1.2KDsc replace 2 a/c bldg 5012 dsc replace boiler with h/p bldg. 5012ArmyArchitect-engineering servicesMay 21, 2024
DoD 90d
W912PF24F0092
BPA call
MPC S.r.l$765Design safety coordination install pulsetech drip system in warehouses bldg. 5040 5070 5080 5090ArmyArchitect-engineering servicesJun 21, 2024
DoD 90d
W912PF25FA032
BPA call
MPC S.r.l$703Liv dsc repair depo east perimeter roadArmyArchitect-engineering servicesMay 2, 2025
DoD 90d
W912PF25FA057
BPA call
MPC S.r.l$703Design safety coordinator (dsc) for project jd1-00125-3p - connect building 113 under power generator.ArmyArchitect-engineering servicesJun 4, 2025
DoD 90d
W912PF24F0076
BPA call
MPC S.r.l$612Design safety coordination upgrade sink exhaust bldg. 5144ArmyArchitect-engineering servicesMay 23, 2024
DoD 90d
W912PF24F0090
BPA call
MPC S.r.l$612Design safety coordination roof repair bldg. 925ArmyArchitect-engineering servicesJun 19, 2024
DoD 90d
W912PF24F0100
BPA call
MPC S.r.l$558Design safety coordination install overhead lifting equipment build. 5150ArmyArchitect-engineering servicesAug 8, 2024
DoD 90d
About this record

Source: USAspending.gov prime award data (FPDS), DoD and DHS contracts, orders and IDVs with any action since Oct 1, 2023. Obligated FY2024+ sums the obligations on those actions; total obligated is the award's lifetime figure. DoD contract actions publish on USAspending about 90 days after signing (DFARS PGI 204.6), so the latest DoD actions here trail the calendar by about 3 months. Place of performance shows the state only.

Terminal: alerts on new orders and modifications to this contract, and CSV export.

7 days free for first-time subscribers, then $49/mo. Card required. Cancel before day 8 and you pay nothing.

Start free trial