AwardTape · Defense awards · Construction · New construction · W56ZTN25D0002
W56ZTN25D0002: $0 IDIQ contract to Arctic Peak LLC
Arctic Peak LLC holds an IDIQ contract from Department of the Army with $0 obligated since Oct 2023, against a ceiling of $46.0M. Latest action Jun 6, 2026.
Single award task order contract (satoc) for building renovation, repair, maintenance, and sustainability of real property on aberdeen proving ground, md.
| PIID | W56ZTN25D0002 |
|---|---|
| Type | IDIQ contract |
| Company | Arctic Peak LLC |
| Agency | Department of the Army |
| Contracting office | W6QK ACC-APG DIR |
| Category | Construction · New construction |
| PSC | Y1JZ CONSTRUCTION OF MISCELLANEOUS BUILDINGS |
| NAICS | 236220 COMMERCIAL AND INSTITUTIONAL BUILDING CONSTRUCTION |
| Obligated since Oct 2023 | $0 |
| Total obligated (lifetime) | $0 |
| Ceiling (base and all options) | $46.0M |
| Base date | Apr 2, 2025 |
| Latest action | Jun 6, 2026 |
| End date | n/a |
| Actions since Oct 2023 | 3 |
| Pricing | Firm fixed price |
| Competition | Not available for competition |
| Source | USAspending.gov record |
| Reporting lag | DoD 90 days |
| Award | Company | Obligated FY2024+ | What | Agency | Category | Latest action |
|---|---|---|---|---|---|---|
| W56ZTN25FA064 delivery order | Arctic Peak LLC | $5.1M | Update hvac and fire protection building 4502 | Army | New construction | Sep 18, 2025 DoD 90d |
| W56ZTN26FA093 delivery order | Arctic Peak LLC | $2.9M | The contractor shall provide design and construct two new parallel overhead steam supply and return piping systems of approx. 230 linear feet for each. the new parallel piping systems, design and build the necessary support structures. | Army | New construction | Jun 5, 2026 DoD 90d |
| W56ZTN25FA051 delivery order | Arctic Peak LLC | $1.9M | This requirement is for the edgewood wastewater treatment plant repairs at aberdeen proving ground, maryland, wr# ie0002z4j. | Army | New construction | Aug 28, 2025 DoD 90d |
| W56ZTN25FA045 delivery order | Arctic Peak LLC | $1.8M | The work to be done under this contract comprises the furnishing of all design, labor, equipment, materials and services and the performance of all work necessary for and incidental to replacing the heating system in e4210 | Army | New construction | Apr 16, 2026 DoD 90d |
| W56ZTN25FA020 delivery order | Arctic Peak LLC | $1.6M | Repair campus drainage system in building 3071 area | Army | New construction | Jan 22, 2026 DoD 90d |
| W56ZTN25FA070 delivery order | Arctic Peak LLC | $1.1M | This requirement funds the repair of the electrical switchgear at building 202 adelphi laboratory center, wr# ap000044j. | Army | New construction | Apr 10, 2026 DoD 90d |
| W56ZTN25FA062 delivery order | Arctic Peak LLC | $750K | Roof inspection and preventative maintenance: various facilities throughout apg north and south | Army | Real property maintenance and repair | Sep 15, 2025 DoD 90d |
| W56ZTN26FA076 delivery order | Arctic Peak LLC | $607K | This requirement is for a single award task order contract for building renovation, repair, maintenance, and sustainability of real property on aberdeen proving ground, maryland. | Army | New construction | May 20, 2026 DoD 90d |
| W56ZTN26FA038 delivery order | Arctic Peak LLC | $512K | This is a design-build project. design and install new water meters at the locations outlined below. in the event that a meter is present at a location replace IT with the new water meter. | Army | New construction | Mar 31, 2026 DoD 90d |
| W56ZTN26FA036 delivery order | Arctic Peak LLC | $376K | This requirement is to repair the cooling tower lines at building 2502 on aberdeen proving ground, maryland. | Army | New construction | Mar 25, 2026 DoD 90d |
| W56ZTN25FA032 delivery order | Arctic Peak LLC | $192K | This task order funds the replacement of the roof top air handling unit at building 2800 on aberdeen proving ground, maryland. | Army | New construction | Dec 3, 2025 DoD 90d |
| W56ZTN26FA014 delivery order | Arctic Peak LLC | $151K | Repair water booster pumps | Army | New construction | Jun 2, 2026 DoD 90d |
| W56ZTN26FA035 delivery order | Arctic Peak LLC | $90K | This requirement is for the installation of handicap door at building 2485. | Army | New construction | Mar 25, 2026 DoD 90d |
| W56ZTN26FA034 delivery order | Arctic Peak LLC | $85K | This requirement is for the building of a fire barrier around existing fire rated door and above fire rated door on in center of breezeway at building 2485. | Army | New construction | Mar 23, 2026 DoD 90d |
| W56ZTN26FA075 delivery order | Arctic Peak LLC | $44K | Provide all plant, supervision, labor, materials, equipment, supplies and transportation necessary to dredge the boat ramp adjacent to the spesutie island piers. | Army | New construction | May 27, 2026 DoD 90d |
| W56ZTN25FA068 delivery order | Arctic Peak LLC | $29K | This action funds the asbestos abatement in building 5106 at aberdeen proving ground, wr# qa000075j. | Army | New construction | Jan 27, 2026 DoD 90d |
Source: USAspending.gov prime award data (FPDS), DoD and DHS contracts, orders and IDVs with any action since Oct 1, 2023. Obligated FY2024+ sums the obligations on those actions; total obligated is the award's lifetime figure. DoD contract actions publish on USAspending about 90 days after signing (DFARS PGI 204.6), so the latest DoD actions here trail the calendar by about 3 months. Place of performance shows the state only.
Terminal: alerts on new orders and modifications to this contract, and CSV export.
7 days free for first-time subscribers, then $49/mo. Card required. Cancel before day 8 and you pay nothing.
Start free trial