AwardTape · Defense awards · Construction · New construction · N4425523D1607
N4425523D1607: $0 IDIQ contract to Tri Coast-Pac Tech JV LLLP
Tri Coast-Pac Tech JV LLLP holds an IDIQ contract from Department of the Navy with $0 obligated since Oct 2023, against a ceiling of $510.0M. Latest action Jan 29, 2026.
Navfac northwest 8(a) macc
| PIID | N4425523D1607 |
|---|---|
| Type | IDIQ contract |
| Company | Tri Coast-Pac Tech JV LLLP |
| Agency | Department of the Navy |
| Contracting office | NAVFACSYSCOM NORTHWEST |
| Category | Construction · New construction |
| PSC | Y1JZ CONSTRUCTION OF MISCELLANEOUS BUILDINGS |
| NAICS | 236220 COMMERCIAL AND INSTITUTIONAL BUILDING CONSTRUCTION |
| Obligated since Oct 2023 | $0 |
| Total obligated (lifetime) | $0 |
| Ceiling (base and all options) | $510.0M |
| Base date | Jul 28, 2023 |
| Latest action | Jan 29, 2026 |
| End date | n/a |
| Actions since Oct 2023 | 10 |
| Pricing | Firm fixed price |
| Competition | Competed after exclusion of sources |
| Source | USAspending.gov record |
| Reporting lag | DoD 90 days |
| Award | Company | Obligated FY2024+ | What | Agency | Category | Latest action |
|---|---|---|---|---|---|---|
| N4425526F0007 delivery order | Tri Coast-Pac Tech JV LLLP | $12.7M | Repair and refurbish all barracks rooms, bathrooms, hallways, common rooms and elevator lobbies in the south wing of b885, 1st through the 10th floors. | Navy | Real property maintenance and repair | Mar 16, 2026 DoD 90d |
| N4425524F4234 delivery order | Tri Coast-Pac Tech JV LLLP | $6.0M | X002 msr #6161184_1771816 -- (ih-db_6161184) install hvac system at b503 psns | Navy | Real property maintenance and repair | Jan 29, 2026 DoD 90d |
| N4425525F0104 delivery order | Tri Coast-Pac Tech JV LLLP | $5.7M | This task order for building 857 is to remove, repair, and replace the existing roof, add an exterior stair access with railing around the perimeter of the building, and relocate the natural gas lines from on top of the roof, to inside the ... | Navy | Real property maintenance and repair | Jun 4, 2025 DoD 90d |
| N4425525F4031 delivery order | Tri Coast-Pac Tech JV LLLP | $2.7M | Repair deteriorated, leaking and loose windows on bldgs. 1 & 12 at nbk manchester | Navy | Real property maintenance and repair | Dec 18, 2024 DoD 90d |
| N4425525F0205 delivery order | Tri Coast-Pac Tech JV LLLP | $2.6M | This is a design-build contract to modernize the passenger elevator controls in building 290 at puget sound naval shipyard. | Navy | Real property maintenance and repair | Aug 14, 2025 DoD 90d |
| N4425525F0054 delivery order | Tri Coast-Pac Tech JV LLLP | $2.0M | This task order on b515 on pier c at psns is to remove and replace the existing roof, add safety rails and the fabrication and installation of an exterior stairway for roof access. | Navy | Real property maintenance and repair | May 12, 2025 DoD 90d |
| N4425525F0201 delivery order | Tri Coast-Pac Tech JV LLLP | $1.6M | Replace or repair of elevator control systems and all ancillary equipment, wiring and fixtures and for each elevator provide an independent, dedicated heating/cooling system with fresh air in the machine room. | Navy | Real property maintenance and repair | Aug 14, 2025 DoD 90d |
| N4425525F0118 delivery order | Tri Coast-Pac Tech JV LLLP | $656K | Redesign cht lift station system on east float of tpp pier in port angeles wa | Navy | Real property maintenance and repair | Jun 13, 2025 DoD 90d |
| N4425524F4193 delivery order | Tri Coast-Pac Tech JV LLLP | $571K | X001 23323639, replace roofing section c29 & c30, b431, psns | Navy | Real property maintenance and repair | Dec 4, 2024 DoD 90d |
| N4425525F0262 delivery order | Tri Coast-Pac Tech JV LLLP | $562K | Replace roof systems b7052 and b7069, trf- bangor | Navy | Real property maintenance and repair | Sep 15, 2025 DoD 90d |
| N4425525F4017 delivery order | Tri Coast-Pac Tech JV LLLP | $560K | Replace all roof sections, b1015 | Navy | Real property maintenance and repair | Sep 5, 2025 DoD 90d |
| N4425525F0074 delivery order | Tri Coast-Pac Tech JV LLLP | $445K | Remove and replace all b475 roofing system layers, insulation layers, gutters, fascia, and soffits. b461 work to include removal of existing roofing system layers, gutter and downspout and the replacement with new | Navy | Real property maintenance and repair | May 29, 2025 DoD 90d |
| N4425525F0228 delivery order | Tri Coast-Pac Tech JV LLLP | $142K | Remodel restroom at afvosf, b2106, swfpac | Navy | Real property maintenance and repair | Sep 19, 2025 DoD 90d |
| N4425525F0258 delivery order | Tri Coast-Pac Tech JV LLLP | $124K | Replace fall protection hunters marsh bridge, b7137, swfpac | Navy | Real property maintenance and repair | Sep 19, 2025 DoD 90d |
Source: USAspending.gov prime award data (FPDS), DoD and DHS contracts, orders and IDVs with any action since Oct 1, 2023. Obligated FY2024+ sums the obligations on those actions; total obligated is the award's lifetime figure. DoD contract actions publish on USAspending about 90 days after signing (DFARS PGI 204.6), so the latest DoD actions here trail the calendar by about 3 months. Place of performance shows the state only.
Terminal: alerts on new orders and modifications to this contract, and CSV export.
7 days free for first-time subscribers, then $49/mo. Card required. Cancel before day 8 and you pay nothing.
Start free trial