N3319120D0811: $0 IDIQ contract to KBR Services, LLC
KBR Services, LLC holds an IDIQ contract from Department of the Navy with $0 obligated since Oct 2023, against a ceiling of $84.6M. Latest action May 26, 2026.
Cldj joc base year - ffp idiq
| PIID | N3319120D0811 |
|---|---|
| Type | IDIQ contract |
| Company | KBR Services, LLC |
| Agency | Department of the Navy |
| Contracting office | NAVFACSYSCOM EUROPE AFRICA CENTRAL |
| Category | Construction · Real property maintenance and repair |
| PSC | Z2AZ REPAIR OR ALTERATION OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS |
| NAICS | 236220 COMMERCIAL AND INSTITUTIONAL BUILDING CONSTRUCTION |
| Obligated since Oct 2023 | $0 |
| Total obligated (lifetime) | $0 |
| Ceiling (base and all options) | $84.6M |
| Base date | Aug 5, 2020 |
| Latest action | May 26, 2026 |
| End date | n/a |
| Actions since Oct 2023 | 4 |
| Pricing | Set per order |
| Competition | Full and open competition |
| Source | USAspending.gov record |
| Reporting lag | DoD 90 days |
| Award | Company | Obligated FY2024+ | What | Agency | Category | Latest action |
|---|---|---|---|---|---|---|
| N3319125F6041 delivery order | KBR Services, LLC | $5.9M | The intent of this project is to provide first (1st) top-end overhauls services to two (2) - prime power generators and replacement of one (1) power generator; remove and demolish generator set #19 at prime power ii (pp2), with two (2) bid ... | Navy | Real property maintenance and repair | Jul 18, 2025 DoD 90d |
| N3319126F0119 delivery order | KBR Services, LLC | $5.1M | Provide first (1st) top-end overhaul services to four (4) prime power generators and second top-end overhaul services to four (4) prime power generators, cldj. project includes 01 bid option to provide control system upgrade. | Navy | New construction | Apr 28, 2026 DoD 90d |
| N3319124F4137 delivery order | KBR Services, LLC | $4.9M | Uem604 st21 0169 prime power generator engine replacements | Navy | Real property maintenance and repair | Sep 5, 2024 DoD 90d |
| N3319124F4375 delivery order | KBR Services, LLC | $3.1M | Cnic- 604 scada system fix, cldj | Navy | Real property maintenance and repair | Sep 30, 2024 DoD 90d |
| N3319125F6189 delivery order | KBR Services, LLC | $2.7M | Conduct a comprehensive assessment and diagnostic evaluation of switchgears located in prime power ii (pp2) and prime power iii (pp3) by the original equipment manufacturer (oem) or authorized representative | Navy | Real property maintenance and repair | Jan 12, 2026 DoD 90d |
| N3319125F6024 delivery order | KBR Services, LLC | $2.6M | The intent of this project is to carry out renovations and repairs to ensure residents within cldj continue to live in adequate and safe living conditions. | Navy | Real property maintenance and repair | Mar 23, 2026 DoD 90d |
| N3319125F6201 delivery order | KBR Services, LLC | $2.1M | The project includes replacing faulty cables connecting pp2a and pp3 connection and faulty cables connecting pp2 and pp2a. | Navy | Installation of equipment | Sep 26, 2025 DoD 90d |
| N3319124F4414 delivery order | KBR Services, LLC | $2.0M | Cnic-211-upgrade street lighting to led | Navy | Real property maintenance and repair | Sep 29, 2025 DoD 90d |
| N3319125F6217 delivery order | KBR Services, LLC | $1.6M | Conduct comprehensive site assessment and diagnostic evaluation of sel relays located in pp2a and pp3 by the original equipment manufacturer (oem) or authorized representative. | Navy | Real property maintenance and repair | Sep 24, 2025 DoD 90d |
| N3319125F6241 delivery order | KBR Services, LLC | $1.5M | Replace feeder cable 11 pp2. the objective is to upgrade and restore the electrical distribution infrastructure to ensure a reliable, safe, and efficient power supply to critical facilities, minimizing downtime and operational risks. | Navy | Installation of equipment | Sep 26, 2025 DoD 90d |
| N3319124F4413 delivery order | KBR Services, LLC | $1.5M | Safety and security of new fuel farm milcon | Navy | Real property maintenance and repair | Sep 30, 2024 DoD 90d |
| N3319124F4366 delivery order | KBR Services, LLC | $1.2M | Cnic-n3379a camp wide replacement of hvac split units, cldj | Navy | Real property maintenance and repair | Sep 28, 2024 DoD 90d |
| N3319125F6165 delivery order | KBR Services, LLC | $1.2M | The project includes repairing and/or renovating a total of 39 identified ablution units (19 base bid, 20 option bid) at various locations within cldj base camp and camp legacy. | Navy | New construction | Sep 11, 2025 DoD 90d |
| N3319124F4379 delivery order | KBR Services, LLC | $1.2M | Bumed-130/102 renovate/upgrade expeditionary medical facility hva | Navy | Real property maintenance and repair | Sep 17, 2024 DoD 90d |
| N3319124F4368 delivery order | KBR Services, LLC | $977K | Cnic-211 fire hydrant improvements, cldj | Navy | Real property maintenance and repair | Feb 12, 2026 DoD 90d |
| N3319124F4382 delivery order | KBR Services, LLC | $811K | Cnic- 1001 repair storm damage to tfs and lps, cldj | Navy | Real property maintenance and repair | May 2, 2025 DoD 90d |
| N3319124F4412 delivery order | KBR Services, LLC | $772K | Safety and security of new emf milcon | Navy | New construction | Sep 30, 2024 DoD 90d |
| N3319126F0063 delivery order | KBR Services, LLC | $763K | This project is the comprehensive repair and/or replacement of deteriorated roofing systems, including all associated gutters and downspouts. this work restores the integrity of roofs, ensure water management, and maintain a watertight ... | Navy | Real property maintenance and repair | May 6, 2026 DoD 90d |
| N3319125F6087 delivery order | KBR Services, LLC | $740K | Provide bldg 1095 shore power connection. provide repair, labor, materials, equipment, supervision, quality control, safety personnel, and management required to perform the work. | Navy | Real property maintenance and repair | Feb 13, 2026 DoD 90d |
| N3319125F6131 delivery order | KBR Services, LLC | $729K | No description on the record | Navy | New construction | Apr 24, 2026 DoD 90d |
| N3319124F4403 delivery order | KBR Services, LLC | $669K | Cnic- 208 and 210 building renovations | Navy | Real property maintenance and repair | Jul 9, 2025 DoD 90d |
| N3319124F4202 delivery order | KBR Services, LLC | $534K | Cnic- cala power upgrade for radar systems | Navy | Real property maintenance and repair | May 2, 2025 DoD 90d |
| N3319125F6206 delivery order | KBR Services, LLC | $527K | The intent of this project is to modify existing fire sprinkler system and fire alarm system to protect the area under the storage mezzanine as required by ufc 3-600-01. | Navy | Real property maintenance and repair | Sep 19, 2025 DoD 90d |
| N3319125F6086 delivery order | KBR Services, LLC | $505K | Repair/recertify water tower fall protection | Navy | Real property maintenance and repair | Jul 29, 2025 DoD 90d |
| N3319126F0073 delivery order | KBR Services, LLC | $478K | The work under this contract consists of providing all labor, materials, equipment, and supervision necessary to execute a complete facade rehabilitation and protective coating system installation on buildings 100 and 150. | Navy | Real property maintenance and repair | May 20, 2026 DoD 90d |
| N3319124F4291 delivery order | KBR Services, LLC | $461K | Circuit breaker and day tank monitor rep | Navy | Real property maintenance and repair | Jun 25, 2025 DoD 90d |
| N3319125F6240 delivery order | KBR Services, LLC | $440K | Cldj-602 relocate clu backup generator pp2. the project intent is to relocate and reinstall the backup diesel generator and associated auxiliary equipment that services the clus (a-d block) to create space for the p332/p334 construction ... | Navy | Installation of equipment | Sep 26, 2025 DoD 90d |
| N3319125F6218 delivery order | KBR Services, LLC | $365K | The purpose of this project is to enhance the security posture of the facilities while addressing drainage issues and improving the structural integrity of the perimeter barrier system. | Navy | Installation of equipment | Sep 26, 2025 DoD 90d |
| N3319125F0047 delivery order | KBR Services, LLC | $355K | Option 4 - cldj joc - ffp idiq | Navy | Real property maintenance and repair | Mar 6, 2025 DoD 90d |
| N3319124F4392 delivery order | KBR Services, LLC | $335K | Cnic-install pre-manufactured cwus for office space at cala -1011, cldj | Navy | Real property maintenance and repair | Sep 21, 2024 DoD 90d |
| N3319124F4107 delivery order | KBR Services, LLC | $291K | Uem-685 renovate/install bathroom-shower addition | Navy | Real property maintenance and repair | Mar 28, 2024 DoD 90d |
| N3319125F6219 delivery order | KBR Services, LLC | $289K | The intent of this project is to remove and install new exterior electrical safety device/breaker panels that are rain resistant and rated for outdoor use that can withstand extreme sun conditions for ground level hvac units. | Navy | Installation of equipment | Sep 26, 2025 DoD 90d |
| N3319124F4068 delivery order | KBR Services, LLC | $264K | Cnic- 450 install backup generator for taxiway and apron,cldj | Navy | Real property maintenance and repair | Feb 22, 2024 DoD 90d |
| N3319125F6150 delivery order | KBR Services, LLC | $238K | Repair/replace feeder cable supplying power to the 724 chrimp yard and the 725 DLA disposition compound. | Navy | Real property maintenance and repair | Aug 29, 2025 DoD 90d |
| N3319126F0008 delivery order | KBR Services, LLC | $235K | The intent of this project is to complete the unfinished line items from the fuel farm truck parking area project with regards to milcon p1701 and produce form 1354 for closeout. | Navy | New construction | Mar 4, 2026 DoD 90d |
| N3319124F4369 delivery order | KBR Services, LLC | $210K | Cnic-310 replace chilled water loop insulation cldj | Navy | Real property maintenance and repair | Apr 14, 2025 DoD 90d |
| N3319124F4346 delivery order | KBR Services, LLC | $194K | Cnic- n3379a install phone lines to u-block clus | Navy | Real property maintenance and repair | May 2, 2025 DoD 90d |
| N3319125F4115 delivery order | KBR Services, LLC | $177K | Cldj-300 renovate ups room/overhaul ups | Navy | Professional services, other | May 10, 2025 DoD 90d |
| N3319124F4109 delivery order | KBR Services, LLC | $177K | Cnic -electric manholes, cldj | Navy | Real property maintenance and repair | Jun 25, 2025 DoD 90d |
| N3319124F4391 delivery order | KBR Services, LLC | $157K | Cnic-680 construct/upgrade/repair the secondary containment system, cldj | Navy | Real property maintenance and repair | Sep 20, 2024 DoD 90d |
| N3319124F4073 delivery order | KBR Services, LLC | $157K | Uem-680 upgrade security fence, prime power iii, cldj | Navy | Real property maintenance and repair | Feb 20, 2024 DoD 90d |
| N3319126F0087 delivery order | KBR Services, LLC | $131K | 315 rebalance hvac crac units | Navy | Real property maintenance and repair | Jun 4, 2026 DoD 90d |
| N3319126F0091 delivery order | KBR Services, LLC | $127K | This project will construct a new vehicle-access sliding gate, install a pedestrian turnstile, and replace the existing fence that meets current security requirements. this will enhance the overall security and operational effectiveness. | Navy | Real property maintenance and repair | May 18, 2026 DoD 90d |
| N3319125F0059 delivery order | KBR Services, LLC | $112K | Replace by repair open bay clu upper. | Navy | Real property maintenance and repair | Mar 25, 2025 DoD 90d |
| N3319124F4310 delivery order | KBR Services, LLC | $97K | Cnic-uem east & west fire pump room fire sprinkler sys modificati | Navy | Real property maintenance and repair | Apr 16, 2025 DoD 90d |
| N3319121F4156 delivery order | KBR Services, LLC | $92K | Sr#17703882 gb top end overhaul pp2 & pp3 | Navy | Real property maintenance and repair | Aug 12, 2024 DoD 90d |
| N3319124F4384 delivery order | KBR Services, LLC | $87K | Repair by replacement of enduring vehicle gate, cldj | Navy | Real property maintenance and repair | Sep 18, 2024 DoD 90d |
| N3319123F4026 delivery order | KBR Services, LLC | $53K | Install gfe tfs hangar and new fire hydrants for USMC at cldj | Navy | Installation of equipment | Sep 24, 2025 DoD 90d |
| N3319123F4419 delivery order | KBR Services, LLC | $48K | Cnic - ppii - 601 - install generator #19 for clu (a-d) back-up, | Navy | New construction | Jun 13, 2025 DoD 90d |
| N3319125F6177 delivery order | KBR Services, LLC | $32K | The intent of this project is to improve the conditions of buildings 737 and 747 by performing deep cleaning, demolishing and disposing of existing ptacs in certain units, and installing new ptacs in certain units. | Navy | Real property maintenance and repair | Sep 15, 2025 DoD 90d |
Source: USAspending.gov prime award data (FPDS), DoD and DHS contracts, orders and IDVs with any action since Oct 1, 2023. Obligated FY2024+ sums the obligations on those actions; total obligated is the award's lifetime figure. DoD contract actions publish on USAspending about 90 days after signing (DFARS PGI 204.6), so the latest DoD actions here trail the calendar by about 3 months. Place of performance shows the state only.
Terminal: alerts on new orders and modifications to this contract, and CSV export.
7 days free for first-time subscribers, then $49/mo. Card required. Cancel before day 8 and you pay nothing.