AwardTape · Defense awards · Construction · Real property maintenance and repair · FA706024D0006
FA706024D0006: $0 IDIQ contract to Koman Sustainable Solutions, LLC
Koman Sustainable Solutions, LLC holds an IDIQ contract from Department of the Air Force with $0 obligated since Oct 2023, against a ceiling of $10.0M. Latest action Aug 13, 2025.
Pkb-project title: mini joc vii electrical, plumbing, heating, ac idiq
| PIID | FA706024D0006 |
|---|---|
| Type | IDIQ contract |
| Company | Koman Sustainable Solutions, LLC |
| Agency | Department of the Air Force |
| Contracting office | FA7060 11TH CONTRACTING SQ PK |
| Category | Construction · Real property maintenance and repair |
| PSC | Z1AZ MAINTENANCE OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS |
| NAICS | 238220 PLUMBING, HEATING, AND AIR-CONDITIONING CONTRACTORS |
| Obligated since Oct 2023 | $0 |
| Total obligated (lifetime) | $0 |
| Ceiling (base and all options) | $10.0M |
| Base date | Sep 11, 2024 |
| Latest action | Aug 13, 2025 |
| End date | n/a |
| Actions since Oct 2023 | 4 |
| Pricing | Firm fixed price |
| Competition | Not available for competition |
| Source | USAspending.gov record |
| Reporting lag | DoD 90 days |
| Award | Company | Obligated FY2024+ | What | Agency | Category | Latest action |
|---|---|---|---|---|---|---|
| FA706025F0117 delivery order | Koman Sustainable Solutions, LLC | $1.1M | Pkb - building management system upgrade b399 | Air Force | Real property maintenance and repair | Apr 28, 2026 DoD 90d |
| FA706025F0100 delivery order | Koman Sustainable Solutions, LLC | $763K | Pkb - this procurement requires the removal and replacement of one (1) air handling unit (ahu), ahu #19 serving rooms 230 and 230a located on the second floor of building 399, in accordance with (iaw) the statement of work (sow). | Air Force | Real property maintenance and repair | Aug 28, 2025 DoD 90d |
| FA706025F0082 delivery order | Koman Sustainable Solutions, LLC | $759K | B399 - replace hvac units 2-5 phase 2 | Air Force | Real property maintenance and repair | Aug 5, 2025 DoD 90d |
| FA706025F0021 delivery order | Koman Sustainable Solutions, LLC | $727K | Pkb - installation of temporary boiler at b20 joint base anacostia bolling followed by full boiler and pump replacement. | Air Force | Real property maintenance and repair | Dec 11, 2024 DoD 90d |
| FA706024F0116 delivery order | Koman Sustainable Solutions, LLC | $640K | Pkb-the procurement requires the replacement of existing 12-inch and 8-inch domestic water lines and valves on the west side of b168 with c900 piping, in accordance with (iaw) the statement of work (sow). | Air Force | Real property maintenance and repair | Aug 21, 2025 DoD 90d |
| FA706025F0053 delivery order | Koman Sustainable Solutions, LLC | $445K | Provide all necessary work needed to meet current mission requirements as outlined in this statement of work (sow). | Air Force | Real property maintenance and repair | Apr 25, 2025 DoD 90d |
| FA706025F0050 delivery order | Koman Sustainable Solutions, LLC | $436K | Pkb - demolish and replace existing boilers and hvacs in b353/354, and 355 in accordance with (iaw) the statement of work (sow). | Air Force | Real property maintenance and repair | Apr 17, 2025 DoD 90d |
| FA706025F0118 delivery order | Koman Sustainable Solutions, LLC | $369K | The purpose of this project is to repair 11 ces meter pits in accordance with (iaw) the statement of work (sow). | Air Force | Real property maintenance and repair | May 26, 2026 DoD 90d |
| FA706025F0090 delivery order | Koman Sustainable Solutions, LLC | $324K | Pkb-b47 replace hvac coils and damper motor | Air Force | Real property maintenance and repair | Sep 5, 2025 DoD 90d |
| FA706025F0121 delivery order | Koman Sustainable Solutions, LLC | $299K | Building 399 power distribution units (pdus) are at the end of their life cycle. customer requests to replace two (2) pdus in the white house communications agency in room 204i and 204k. | Air Force | Real property maintenance and repair | Sep 17, 2025 DoD 90d |
| FA706025F0111 delivery order | Koman Sustainable Solutions, LLC | $298K | Pkb - b398 repair motor generator set and control panel | Air Force | Real property maintenance and repair | Sep 18, 2025 DoD 90d |
| FA706025F0062 delivery order | Koman Sustainable Solutions, LLC | $243K | Pkb- replace the existing automatic transfer switch unit in the electrical room with a new, fully functional unit. alos, ensure uninterrupted power supply to the facility during and after the replacement. | Air Force | Real property maintenance and repair | Feb 13, 2026 DoD 90d |
| FA706026F0011 delivery order | Koman Sustainable Solutions, LLC | $202K | Pkb-b3610 replace chiller | Air Force | Real property maintenance and repair | Jan 8, 2026 DoD 90d |
| FA706025F0134 delivery order | Koman Sustainable Solutions, LLC | $180K | The purpose of this requirement is to provide all labor and equipment to accomplish the removal and replacement of the multiple air handling units at b351 joint base anacostia-bolling in accordance with (iaw) the statement of work (sow). | Air Force | Real property maintenance and repair | Sep 23, 2025 DoD 90d |
| FA706025F0030 delivery order | Koman Sustainable Solutions, LLC | $175K | Pkb-project title: b418 repair grease drain lines from grease trap | Air Force | Real property maintenance and repair | Feb 25, 2025 DoD 90d |
| FA706025F0031 delivery order | Koman Sustainable Solutions, LLC | $163K | Pkb - b417 replace hot water boilers | Air Force | Real property maintenance and repair | Jan 31, 2025 DoD 90d |
| FA706024F0155 delivery order | Koman Sustainable Solutions, LLC | $149K | Pkb - urgent high voltage switch repair b60 jbab. | Air Force | Real property maintenance and repair | Sep 30, 2024 DoD 90d |
| FA706026F0030 delivery order | Koman Sustainable Solutions, LLC | $137K | The procurement requires the contractor to bring hot water to four rooms in b3619 and provide all necessary work needed to meet current mission requirements as outlined in accordance with (iaw) the statement of work (sow). | Air Force | Real property maintenance and repair | Mar 24, 2026 DoD 90d |
| FA706026F0027 delivery order | Koman Sustainable Solutions, LLC | $132K | Repair water lines at b50, duncan ave, and b351 | Air Force | Real property maintenance and repair | Feb 27, 2026 DoD 90d |
| FA706025F0055 delivery order | Koman Sustainable Solutions, LLC | $123K | Install temporary chiller iaw the statement of work (sow). | Air Force | Real property maintenance and repair | Apr 29, 2025 DoD 90d |
| FA706025F0084 delivery order | Koman Sustainable Solutions, LLC | $118K | Pkb-project title: mini joc vii electrical, plumbing, heating, ac idiq | Air Force | Real property maintenance and repair | Jul 31, 2025 DoD 90d |
| FA706026F0024 delivery order | Koman Sustainable Solutions, LLC | $111K | Pkb - b20 repair broken water main | Air Force | Real property maintenance and repair | Feb 24, 2026 DoD 90d |
| FA706025F0022 delivery order | Koman Sustainable Solutions, LLC | $107K | The intent of this project is to repair two underground waterline breakages serving buildings 20, arnold gate, and 46. | Air Force | Real property maintenance and repair | Dec 12, 2024 DoD 90d |
| FA706025F0070 delivery order | Koman Sustainable Solutions, LLC | $107K | Pkb-provide and install a temporary chiller for building 3610 | Air Force | Real property maintenance and repair | Sep 30, 2025 DoD 90d |
| FA706026F0047 delivery order | Koman Sustainable Solutions, LLC | $97K | The procurement requires the contractor to provide temporary cooling to building 72 (b72) as well as all necessary work needed to meet current mission requirements as outlined in accordance with (iaw) the statement of work (sow). | Air Force | Real property maintenance and repair | Apr 28, 2026 DoD 90d |
| FA706025F0085 delivery order | Koman Sustainable Solutions, LLC | $95K | Pkb-project title: mini joc vii electrical, plumbing, heating, ac idiq | Air Force | Real property maintenance and repair | Jul 31, 2025 DoD 90d |
| FA706026F0020 delivery order | Koman Sustainable Solutions, LLC | $88K | Contractor shall excavate as necessary, repair the leak and backfill as well as provide all necessary work needed to meet current mission requirements in accordance with (iaw) the statement of work (sow). | Air Force | Real property maintenance and repair | Feb 5, 2026 DoD 90d |
| FA706025F0035 delivery order | Koman Sustainable Solutions, LLC | $79K | Pkb - b3619 emergency replace hot water heater | Air Force | Real property maintenance and repair | Mar 4, 2025 DoD 90d |
| FA706026F0044 delivery order | Koman Sustainable Solutions, LLC | $78K | Repair broken water line at b928. | Air Force | Real property maintenance and repair | May 13, 2026 DoD 90d |
| FA706025F0092 delivery order | Koman Sustainable Solutions, LLC | $71K | Pkb - repair the water main break to include concrete removal and backfill, electrical conduit repair, light pole base installation, and sidewalk replacement in accordance with (iaw) the statement of work (sow). | Air Force | Real property maintenance and repair | Aug 18, 2025 DoD 90d |
| FA706026F0012 delivery order | Koman Sustainable Solutions, LLC | $59K | Pkb-project title: mini joc vii electrical, plumbing, heating, ac idiq | Air Force | Real property maintenance and repair | Dec 19, 2025 DoD 90d |
| FA706025F0115 delivery order | Koman Sustainable Solutions, LLC | $58K | Pkb-b5681 testing and repair fire alarm | Air Force | Real property maintenance and repair | Sep 10, 2025 DoD 90d |
| FA706025F0009 delivery order | Koman Sustainable Solutions, LLC | $53K | The contractor shall provide all necessary work needed to meet current mission requirements as outlined in the statement of work (sow). | Air Force | Real property maintenance and repair | Nov 7, 2024 DoD 90d |
| FA706026F0009 delivery order | Koman Sustainable Solutions, LLC | $53K | Pkb - b50 replace backflow assembly | Air Force | Real property maintenance and repair | Dec 11, 2025 DoD 90d |
| FA706026F0010 delivery order | Koman Sustainable Solutions, LLC | $41K | Repair 3 fire pumps located at b398 and provide all necessary work in accordance with (iaw) the statement of work (sow). | Air Force | Real property maintenance and repair | May 21, 2026 DoD 90d |
| FA706026F0016 delivery order | Koman Sustainable Solutions, LLC | $40K | Pkb - repair sewer line break | Air Force | Real property maintenance and repair | Jan 23, 2026 DoD 90d |
| FA706025F0028 delivery order | Koman Sustainable Solutions, LLC | $38K | Pkb - repair control panel at bme lift station | Air Force | Real property maintenance and repair | Feb 3, 2025 DoD 90d |
| FA706025F0039 delivery order | Koman Sustainable Solutions, LLC | $37K | Pkb - the procurement requires crac removal and split system installation in b72 as well as all necessary work in accordance with (iaw) the statement of work (sow). | Air Force | Real property maintenance and repair | Mar 13, 2025 DoD 90d |
| FA706026F0041 delivery order | Koman Sustainable Solutions, LLC | $34K | Repair water break at building 71. | Air Force | Real property maintenance and repair | Mar 27, 2026 DoD 90d |
| FA706025F0079 delivery order | Koman Sustainable Solutions, LLC | $30K | Pkb - b413 cdc 3 repair hvac (cooling tower). | Air Force | Real property maintenance and repair | Aug 15, 2025 DoD 90d |
| FA706026F0035 delivery order | Koman Sustainable Solutions, LLC | $24K | Pkb - b420 emergency pump system repair | Air Force | Real property maintenance and repair | Mar 20, 2026 DoD 90d |
| FA706026F0060 delivery order | Koman Sustainable Solutions, LLC | $23K | Pkb - b3 repair ahu-2 | Air Force | Real property maintenance and repair | May 21, 2026 DoD 90d |
| FA706026F0045 delivery order | Koman Sustainable Solutions, LLC | $22K | Install new underground supply and return valves at b1307 | Air Force | Real property maintenance and repair | May 5, 2026 DoD 90d |
| FA706025F0029 delivery order | Koman Sustainable Solutions, LLC | $17K | Pkb- replacement of two 6inch osy sprinkler valves located in a small room above the main mechanical room in building 20 in accordance with (iaw) the statement of work (sow). | Air Force | Real property maintenance and repair | Jan 28, 2025 DoD 90d |
| FA706025F0012 delivery order | Koman Sustainable Solutions, LLC | $10K | The purpose of this project is to stop the flow of contaminated stormwater into the pumping station and provide temporary pumps to mitigate flooding onto the airfield. | Air Force | Real property maintenance and repair | Jun 10, 2025 DoD 90d |
| FA706025F0139 delivery order | Koman Sustainable Solutions, LLC | $7.6K | This project adds three new dedicated 20a circuits within mini mart rm235, originating from the existing electrical panel, to power appliances (refrigerators and freezer). | Air Force | Real property maintenance and repair | Sep 24, 2025 DoD 90d |
Source: USAspending.gov prime award data (FPDS), DoD and DHS contracts, orders and IDVs with any action since Oct 1, 2023. Obligated FY2024+ sums the obligations on those actions; total obligated is the award's lifetime figure. DoD contract actions publish on USAspending about 90 days after signing (DFARS PGI 204.6), so the latest DoD actions here trail the calendar by about 3 months. Place of performance shows the state only.