AwardTape · Defense awards · Construction · Real property maintenance and repair · FA500423D0001
FA500423D0001: $0 IDIQ contract to Heritage-M2c1 Joint Venture
Heritage-M2c1 Joint Venture holds an IDIQ contract from Department of the Air Force with $0 obligated since Oct 2023, against a ceiling of $75.0M. Latest action Mar 11, 2026.
Simplified acquisition of base engineering requirements (saber) eielson afb alaska
| PIID | FA500423D0001 |
|---|---|
| Type | IDIQ contract |
| Company | Heritage-M2c1 Joint Venture |
| Agency | Department of the Air Force |
| Contracting office | FA5004 354 CONS PK |
| Category | Construction · Real property maintenance and repair |
| PSC | Z1QA MAINTENANCE OF RESTORATION OF REAL PROPERTY (PUBLIC OR PRIVATE) |
| NAICS | 236220 COMMERCIAL AND INSTITUTIONAL BUILDING CONSTRUCTION |
| Obligated since Oct 2023 | $0 |
| Total obligated (lifetime) | $0 |
| Ceiling (base and all options) | $75.0M |
| Base date | Dec 9, 2022 |
| Latest action | Mar 11, 2026 |
| End date | n/a |
| Actions since Oct 2023 | 10 |
| Pricing | Firm fixed price |
| Competition | Competed after exclusion of sources |
| Source | USAspending.gov record |
| Reporting lag | DoD 90 days |
| Award | Company | Obligated FY2024+ | What | Agency | Category | Latest action |
|---|---|---|---|---|---|---|
| FA500425F0042 delivery order | Heritage-M2c1 Joint Venture | $3.0M | Engineer, furnish, install and test efit new 12 strand single mode sm fiber optic cable foc and 36 strand sm foc from new information transfer node itn to end buildings ebs at eielson afb ak. | Air Force | IT products: network | Aug 13, 2025 DoD 90d |
| FA500425F0008 delivery order | Heritage-M2c1 Joint Venture | $1.7M | Saber:dxeb 16-1031 repair overhead power old camp | Air Force | Real property maintenance and repair | Oct 22, 2024 DoD 90d |
| FA500425F0083 delivery order | Heritage-M2c1 Joint Venture | $1.2M | Replacement of base-wide signs and other items iaw the sow. | Air Force | Real property maintenance and repair | Aug 22, 2025 DoD 90d |
| FA500426F0018 delivery order | Heritage-M2c1 Joint Venture | $1.0M | Convert storage room to kitchen in buildings 2272 and 3116 iaw attached proposal. | Air Force | Real property maintenance and repair | Feb 24, 2026 DoD 90d |
| FA500425F0075 delivery order | Heritage-M2c1 Joint Venture | $999K | This requirement is for the installation of an emergency power generator system within an arctic enclosure on a concrete pad at the child development center (cdc) sewage lift station (bldg. 5182). | Air Force | Real property maintenance and repair | Aug 27, 2025 DoD 90d |
| FA500425F0011 delivery order | Heritage-M2c1 Joint Venture | $992K | Airfield directional boring | Air Force | Real property maintenance and repair | Apr 8, 2026 DoD 90d |
| FA500424F0075 delivery order | Heritage-M2c1 Joint Venture | $979K | Comm node shack (bto) | Air Force | Real property maintenance and repair | Apr 8, 2026 DoD 90d |
| FA500425F0088 delivery order | Heritage-M2c1 Joint Venture | $824K | Install a fire detection system the building and to refinish the interior and exterior of the structure bldg 1146. | Air Force | Real property maintenance and repair | Aug 22, 2025 DoD 90d |
| FA500425F0092 delivery order | Heritage-M2c1 Joint Venture | $796K | Replace one active r-22 computer room air conditioning unit, one active r-22 hvac unit, and demolish two inactive crac units. | Air Force | Real property maintenance and repair | Aug 20, 2025 DoD 90d |
| FA500424F0037 delivery order | Heritage-M2c1 Joint Venture | $748K | Fy24 f18pa 374449 354 ces fm9 bto ftqw 24-1100 repair pole mounted transformer b2350 | Air Force | Real property maintenance and repair | Sep 8, 2025 DoD 90d |
| FA500424F0038 delivery order | Heritage-M2c1 Joint Venture | $696K | Ftqw 24-1103 lift station generator b3350 - aux heat plant bto | Air Force | Real property maintenance and repair | Apr 2, 2024 DoD 90d |
| FA500424F0061 delivery order | Heritage-M2c1 Joint Venture | $690K | Install generators at jmc lift station | Air Force | Real property maintenance and repair | Aug 21, 2025 DoD 90d |
| FA500424F0107 delivery order | Heritage-M2c1 Joint Venture | $640K | Ftqw 25-4501 motorized airfield vehicle gate (bto) | Air Force | Real property maintenance and repair | Aug 27, 2025 DoD 90d |
| FA500424F0076 delivery order | Heritage-M2c1 Joint Venture | $592K | Ftqw 25-1104 b6350 repair munitions storage deficiencies (bto) | Air Force | Real property maintenance and repair | Oct 23, 2025 DoD 90d |
| FA500425F0005 delivery order | Heritage-M2c1 Joint Venture | $589K | Ftqw 25-1403 install lift station generator -18 agr bldg. 4110 west parking lot. install a generator, fuel storage tanks and automatic transfer switches within an artic enclosure on concrete pads at the 18 agr hqs lift station. | Air Force | Real property maintenance and repair | Oct 28, 2024 DoD 90d |
| FA500424F0080 delivery order | Heritage-M2c1 Joint Venture | $573K | Ftqw 25-1107 b6369 repair munitions storage igloo deficiencies | Air Force | Real property maintenance and repair | Apr 22, 2025 DoD 90d |
| FA500424F0083 delivery order | Heritage-M2c1 Joint Venture | $559K | B6352 repair munitions storage igloo deficiencies | Air Force | Real property maintenance and repair | Apr 22, 2025 DoD 90d |
| FA500425F0024 delivery order | Heritage-M2c1 Joint Venture | $543K | Product - 48 strand single mode fiber optic cable from b1151-deployable debrief facilities ftqw-2024-00002-00001 | Air Force | IT products: network | Jun 1, 2026 DoD 90d |
| FA500425F0004 delivery order | Heritage-M2c1 Joint Venture | $523K | Bto ftqw 25-1404 b3214 install lift station generator | Air Force | Real property maintenance and repair | Oct 28, 2024 DoD 90d |
| FA500425F0094 delivery order | Heritage-M2c1 Joint Venture | $506K | This project is for the conversion of existing pole mounted transformers to a pad mounted transformer at building 1183 det 460 on eielson afb, alaska. | Air Force | Real property maintenance and repair | Aug 28, 2025 DoD 90d |
| FA500425F0007 delivery order | Heritage-M2c1 Joint Venture | $502K | Bto ftqw 25-1400 b1346 pole to pad mounted transformer | Air Force | Real property maintenance and repair | Oct 28, 2024 DoD 90d |
| FA500424F0066 delivery order | Heritage-M2c1 Joint Venture | $496K | Ftqw 24-1115 lift station generator- koyuk ave (bto) | Air Force | Real property maintenance and repair | Apr 1, 2026 DoD 90d |
| FA500425F0091 delivery order | Heritage-M2c1 Joint Venture | $495K | This requirement is for the conversion of existing pole mounted transformers to a pad mounted transformer at building 1301, on eielson air force base (afb), alaska. | Air Force | Real property maintenance and repair | Aug 28, 2025 DoD 90d |
| FA500425F0089 delivery order | Heritage-M2c1 Joint Venture | $475K | Convert existing pole mounted transformers to a pad mounted transformer at the location building 4304. | Air Force | Real property maintenance and repair | Aug 20, 2025 DoD 90d |
| FA500424F0015 delivery order | Heritage-M2c1 Joint Venture | $461K | No description on the record | Air Force | Real property maintenance and repair | Sep 16, 2024 DoD 90d |
| FA500424F0044 delivery order | Heritage-M2c1 Joint Venture | $452K | Bto ftqw 24-1502 b1347 alternate command post | Air Force | Real property maintenance and repair | Aug 21, 2024 DoD 90d |
| FA500424F0059 delivery order | Heritage-M2c1 Joint Venture | $439K | Repair of pole mounted transformers at building 3427 | Air Force | Real property maintenance and repair | Jun 28, 2024 DoD 90d |
| FA500424F0062 delivery order | Heritage-M2c1 Joint Venture | $402K | Repair of pole mounted transformers at building 3408 | Air Force | Real property maintenance and repair | Aug 21, 2024 DoD 90d |
| FA500424F0060 delivery order | Heritage-M2c1 Joint Venture | $395K | Repair pole mounted transformers at building 3430 | Air Force | Real property maintenance and repair | Jun 28, 2024 DoD 90d |
| FA500425F0090 delivery order | Heritage-M2c1 Joint Venture | $355K | Facilitate conversion of pole mounted transformers to pad mounted transformers for buildings 1334/1338 on eielson afb alaska. | Air Force | Real property maintenance and repair | Sep 2, 2025 DoD 90d |
| FA500425F0006 delivery order | Heritage-M2c1 Joint Venture | $335K | Bto ftqw 25-1408 b2225 pole to pad mounted transformer | Air Force | Real property maintenance and repair | Oct 28, 2024 DoD 90d |
| FA500425F0093 delivery order | Heritage-M2c1 Joint Venture | $331K | Converting existing pole mounted transformers to a pad mounted transformer at building 3113/3114. | Air Force | Real property maintenance and repair | Aug 20, 2025 DoD 90d |
| FA500425F0098 delivery order | Heritage-M2c1 Joint Venture | $289K | Ftqw 25-1402 repair yukon club lift station (b2225) bto | Air Force | Real property maintenance and repair | Mar 31, 2026 DoD 90d |
| FA500425F0039 delivery order | Heritage-M2c1 Joint Venture | $282K | Conduct modifications to the facility transformers for building 3109 on eielson air force base (afb), alaska. the subject project involves converting theexisting pole mounted transformers to a pad mounted transformer at the location ... | Air Force | Real property maintenance and repair | May 9, 2025 DoD 90d |
| FA500424F0013 delivery order | Heritage-M2c1 Joint Venture | $251K | Ftqw 23-4100 replace interior doors fox dens (1337,1228) | Air Force | Real property maintenance and repair | Aug 21, 2024 DoD 90d |
| FA500424F0014 delivery order | Heritage-M2c1 Joint Venture | $158K | Bto ftqw 23-4101 replace exterior doors (1347) | Air Force | Real property maintenance and repair | Sep 24, 2024 DoD 90d |
| FA500424F0020 delivery order | Heritage-M2c1 Joint Venture | $152K | Paint guard headquarters building | Air Force | Real property maintenance and repair | Feb 6, 2024 DoD 90d |
| FA500423F0045 delivery order | Heritage-M2c1 Joint Venture | $137K | The purpose of this order is the updating of vault doors for fighter squadron. | Air Force | Real property maintenance and repair | Apr 25, 2024 DoD 90d |
| FA500425F0053 delivery order | Heritage-M2c1 Joint Venture | $85K | Repair wing walls munitions storage igloo (b6371). | Air Force | Real property maintenance and repair | Jun 4, 2025 DoD 90d |
| FA500424F0030 delivery order | Heritage-M2c1 Joint Venture | $82K | Bto cts wall | Air Force | Real property maintenance and repair | Feb 28, 2024 DoD 90d |
| FA500423F0052 delivery order | Heritage-M2c1 Joint Venture | $73K | This statement of objectives (soo) covers the governments requirement to build a living quarters in building 4110 on eielson air force base, alaska. this living quarters will enable the mission response requirements. | Air Force | Real property maintenance and repair | Jan 24, 2024 DoD 90d |
| FA500423F0079 delivery order | Heritage-M2c1 Joint Venture | $65K | N/a | Air Force | Real property maintenance and repair | May 2, 2024 DoD 90d |
| FA500425F0038 delivery order | Heritage-M2c1 Joint Venture | $56K | Demo the north end wall and portions of the east and west walls as well as interior finishes to expose trusses to investigate and assess damage caused by snow. | Air Force | Real property maintenance and repair | May 6, 2025 DoD 90d |
| FA500426F0038 delivery order | Heritage-M2c1 Joint Venture | $38K | No description on the record | Air Force | Real property maintenance and repair | Apr 28, 2026 DoD 90d |
| FA500423F0051 delivery order | Heritage-M2c1 Joint Venture | $36K | Rans building interior repair | Air Force | Real property maintenance and repair | Dec 8, 2023 DoD 90d |
| FA500424F0027 delivery order | Heritage-M2c1 Joint Venture | $36K | Repair hangar doors | Air Force | Real property maintenance and repair | Mar 6, 2024 DoD 90d |
| FA500426F0027 delivery order | Heritage-M2c1 Joint Venture | $28K | Upgrade existing power circuits within room 18, converting existing nema l5-30 receptacles to nema l6-30 receptacles in order to enable upcoming equipment upgrades. | Air Force | Real property maintenance and repair | Mar 31, 2026 DoD 90d |
| FA500426F0015 delivery order | Heritage-M2c1 Joint Venture | $28K | Ymca classroom renovation iaw sow | Air Force | Real property maintenance and repair | Jan 8, 2026 DoD 90d |
| FA500426F0016 delivery order | Heritage-M2c1 Joint Venture | $26K | Naics code: 236220/ size standard: $39.5 million design services for ftqw261107 upgrade circuits for power shear, existing milling machine, and new milling equipment (1353). | Air Force | Real property maintenance and repair | Jan 6, 2026 DoD 90d |
| FA500425F0056 delivery order | Heritage-M2c1 Joint Venture | $17K | Install a wall and renovate an existing office space to create one (1) office and one (1) lactation room in bldg. 4110 | Air Force | Real property maintenance and repair | Jun 11, 2025 DoD 90d |
Source: USAspending.gov prime award data (FPDS), DoD and DHS contracts, orders and IDVs with any action since Oct 1, 2023. Obligated FY2024+ sums the obligations on those actions; total obligated is the award's lifetime figure. DoD contract actions publish on USAspending about 90 days after signing (DFARS PGI 204.6), so the latest DoD actions here trail the calendar by about 3 months. Place of performance shows the state only.
Terminal: alerts on new orders and modifications to this contract, and CSV export.
7 days free for first-time subscribers, then $49/mo. Card required. Cancel before day 8 and you pay nothing.
Start free trial