Tracked vehiclesAnduril Enterprise 0.87% fill $173.4M / $20BCBP AST 46.50% fill $929.9M / $2.0BPalantir Maven 81.60% fill $637.6M / $781.3MShield AI USCG $61.4M drawn 12 ordersCounter-drone $2.1B drawn 25 C-UAS vehicles and awardsUSAspending compile · Oct 9 2026
AwardTape

AwardTape · Defense awards · Maintenance and repair · Equipment maintenance, other · FA442720D0006

FA442720D0006: $0 IDIQ contract to JP General Inc

JP General Inc holds an IDIQ contract from Department of the Air Force with $0 obligated since Oct 2023, against a ceiling of $5.0M. Latest action Feb 26, 2025.

Handyman services

PIIDFA442720D0006
TypeIDIQ contract
CompanyJP General Inc
AgencyDepartment of the Air Force
Contracting officeFA4427 60 CONS LGC
CategoryMaintenance and repair · Equipment maintenance, other
PSCJ099 MAINT/REPAIR/REBUILD OF EQUIPMENT- MISCELLANEOUS
NAICS236118 RESIDENTIAL REMODELERS
Obligated since Oct 2023$0
Total obligated (lifetime)$0
Ceiling (base and all options)$5.0M
Base dateFeb 28, 2020
Latest actionFeb 26, 2025
End daten/a
Actions since Oct 20232
PricingSet per order
CompetitionCompeted under simplified acquisition
SourceUSAspending.gov record
Reporting lagDoD 90 days
Orders under this award11 orders · search
AwardCompanyObligated FY2024+WhatAgencyCategoryLatest action
FA442725F0034
delivery order
JP General Inc$250KThe ktr shall provide all design labor, materials, and supervision to upgrade and replace the existing boiler system iaw attach 1 bldg 150 - boiler statement of need 11 feb 2025.Air ForceEquipment maintenance, otherAug 5, 2025
DoD 90d
FA442725F0041
delivery order
JP General Inc$116KThe contractor shall provide all labor, materials, equipment, and supervision necessary to install a new two 2-ton split-system crac unit in b177 in accordance with the attached statement of work.Air ForceReal property maintenance and repairJul 25, 2025
DoD 90d
FA442725F0013
delivery order
JP General Inc$63KThe contractor shall provide all materials, labor, and equipment to complete all aspects outlined in attachment 01 - bldg. 154 - add rollup door- son 7 nov 24 and attachment 4 - b154 add roll up door contractor proposal 19 dec 24Air ForceReal property maintenance and repairApr 16, 2025
DoD 90d
FA442725F0048
delivery order
JP General Inc$58KIaw various cyp windows - amended son, dated 25 august 2025.Air ForceReal property maintenance and repairSep 30, 2025
DoD 90d
FA442724F0016
delivery order
JP General Inc$56KInstalling two light poles for parking-lotAir ForceEquipment maintenance, otherJun 12, 2024
DoD 90d
FA442724F0017
delivery order
JP General Inc$38KRemove and replace 16x16 roll-up door.Air ForceEquipment maintenance, otherJun 12, 2024
DoD 90d
FA442724F0063
delivery order
JP General Inc$6.8KP4 replace windowsAir ForceReal property maintenance and repairJan 15, 2025
DoD 90d
FA442723F0065
delivery order
JP General Inc$0No description on the recordAir ForceReal property maintenance and repairJun 5, 2025
DoD 90d
FA442723F0068
delivery order
JP General Inc$0B4 base ops wall repairAir ForceReal property maintenance and repairDec 2, 2024
DoD 90d
FA442723F0069
delivery order
JP General Inc$0Repair of in-ground hydraulic lift system for heavy vehicles.Air ForceEquipment maintenance, otherJun 12, 2024
DoD 90d
FA442722F0048
delivery order
JP General Inc-$22K4 ea heaters to be installed at base entrance gatesAir ForceReal property maintenance and repairFeb 5, 2025
DoD 90d
About this record

Source: USAspending.gov prime award data (FPDS), DoD and DHS contracts, orders and IDVs with any action since Oct 1, 2023. Obligated FY2024+ sums the obligations on those actions; total obligated is the award's lifetime figure. DoD contract actions publish on USAspending about 90 days after signing (DFARS PGI 204.6), so the latest DoD actions here trail the calendar by about 3 months. Place of performance shows the state only.

Terminal: alerts on new orders and modifications to this contract, and CSV export.

7 days free for first-time subscribers, then $49/mo. Card required. Cancel before day 8 and you pay nothing.

Start free trial