AwardTape · Defense awards · Construction · Real property maintenance and repair · FA283523D0006
FA283523D0006: $0 IDIQ contract to Monument Construction LLC
Monument Construction LLC holds an IDIQ contract from Department of the Air Force with $0 obligated since Oct 2023, against a ceiling of $20.0M. Latest action Apr 22, 2025.
Multiple award contract for small purchase orders: macspo 2023-2028
| PIID | FA283523D0006 |
|---|---|
| Type | IDIQ contract |
| Company | Monument Construction LLC |
| Agency | Department of the Air Force |
| Contracting office | FA2835 AFLCMC HANSCOM PZI |
| Category | Construction · Real property maintenance and repair |
| PSC | Z2JZ REPAIR OR ALTERATION OF MISCELLANEOUS BUILDINGS |
| NAICS | 236220 COMMERCIAL AND INSTITUTIONAL BUILDING CONSTRUCTION |
| Obligated since Oct 2023 | $0 |
| Total obligated (lifetime) | $0 |
| Ceiling (base and all options) | $20.0M |
| Base date | Mar 9, 2023 |
| Latest action | Apr 22, 2025 |
| End date | n/a |
| Actions since Oct 2023 | 1 |
| Pricing | Firm fixed price |
| Competition | Competed after exclusion of sources |
| Source | USAspending.gov record |
| Reporting lag | DoD 90 days |
| Award | Company | Obligated FY2024+ | What | Agency | Category | Latest action |
|---|---|---|---|---|---|---|
| FA283525F0060 delivery order | Monument Construction LLC | $89K | In accordance with the statement of work (sow) dated 31 march 2025, this project is intended to remove existing drainage system with metal grate and replace in kind with new, precast concrete, wider drainage system. | Air Force | Real property maintenance and repair | Aug 13, 2025 DoD 90d |
| FA283525F0066 delivery order | Monument Construction LLC | $54K | In accordance with the statement of work (sow) dated 27 june 2025, this project is intended to remove playground equipment and poured in place rubber ground and install loam and hydroseed. | Air Force | Real property maintenance and repair | Aug 25, 2025 DoD 90d |
| FA283524F0008 delivery order | Monument Construction LLC | $37K | Repair walkway | Air Force | Real property maintenance and repair | Nov 14, 2023 DoD 90d |
| FA283525F0023 delivery order | Monument Construction LLC | $36K | In accordance with the statement of work (sow) dated 18 november 2024, this project is intended to replace in kind, existing slide gate operator. | Air Force | Real property maintenance and repair | Feb 13, 2025 DoD 90d |
| FA283525F0095 delivery order | Monument Construction LLC | $20K | In accordance with the statement of work (sow) dated 14 april 2025, this project intent is to remove and replace exterior facia board along the north side of the building. | Air Force | Real property maintenance and repair | Sep 18, 2025 DoD 90d |
| FA283525F0061 delivery order | Monument Construction LLC | $20K | In accordance with the statement of work (sow) dated 2 april 2025, this project is intended to replace inbound lift gate operator and proxy card podium. | Air Force | Real property maintenance and repair | Jan 28, 2026 DoD 90d |
| FA283524F0039 delivery order | Monument Construction LLC | $16K | In accordance with the statement of work (sow) dated 8 march 2024, this project is intended to build one (1) phase 2 room #1ho258a in building 1614 | Air Force | Real property maintenance and repair | May 8, 2024 DoD 90d |
| FA283525F0070 delivery order | Monument Construction LLC | $16K | In accordance with the statement of work (sow) dated 31 july 2025, this project is intended to provide a structural infill and epdm restoration of a 90-mil black sure-seal system over polyiso/densdeck/concrete at b1102. | Air Force | Real property maintenance and repair | Aug 27, 2025 DoD 90d |
| FA283524F0032 delivery order | Monument Construction LLC | $15K | Replace rollup door building 1109 | Air Force | Real property maintenance and repair | Mar 22, 2024 DoD 90d |
| FA283525F0062 delivery order | Monument Construction LLC | $15K | In accordance with the statement of work (sow) dated 20 march 2025, this project is intended to replace two (2) exterior steel door to the mechanical room in building 1508. | Air Force | Real property maintenance and repair | Dec 5, 2025 DoD 90d |
| FA283524F0009 delivery order | Monument Construction LLC | $13K | This action is intended for the purchase and installation of one (1) sound transmission class (stc) 50 rated acoustical door assembly door within an existing space in building 1150 | Air Force | Real property maintenance and repair | Nov 27, 2023 DoD 90d |
| FA283525F0058 delivery order | Monument Construction LLC | $11K | In accordance with the statement of work (sow) dated 18 november 2024, this project is intended to replace existing garage door motor and hardware components. | Air Force | Real property maintenance and repair | Dec 4, 2025 DoD 90d |
| FA283525F0028 delivery order | Monument Construction LLC | $6.6K | In accordance with the statement of work (sow) dated 19 november 2024, this project is intended to remove and dispose of existing railings and install new railings on the deck of building 110 at fourth cliff. | Air Force | Real property maintenance and repair | Mar 31, 2025 DoD 90d |
| FA283525F0065 delivery order | Monument Construction LLC | $1.6K | In accordance with the statement of work (sow) dated 21 may 2021, this project is intended to remove and install damaged or missing asphalt roof shingles. | Air Force | Real property maintenance and repair | May 28, 2026 DoD 90d |
Source: USAspending.gov prime award data (FPDS), DoD and DHS contracts, orders and IDVs with any action since Oct 1, 2023. Obligated FY2024+ sums the obligations on those actions; total obligated is the award's lifetime figure. DoD contract actions publish on USAspending about 90 days after signing (DFARS PGI 204.6), so the latest DoD actions here trail the calendar by about 3 months. Place of performance shows the state only.
Terminal: alerts on new orders and modifications to this contract, and CSV export.
7 days free for first-time subscribers, then $49/mo. Card required. Cancel before day 8 and you pay nothing.
Start free trial