AwardTape · Defense awards · Construction · Architect-engineering services · FA282321D0003
FA282321D0003: $0 IDIQ contract to Peterson Engineering LLC
Peterson Engineering LLC holds an IDIQ contract from Department of the Air Force with $0 obligated since Oct 2023, against a ceiling of $7.0M. Latest action Jan 8, 2024.
Architect-engineer idiq
| PIID | FA282321D0003 |
|---|---|
| Type | IDIQ contract |
| Company | Peterson Engineering LLC |
| Agency | Department of the Air Force |
| Contracting office | FA2823 AFTC PZIO |
| Category | Construction · Architect-engineering services |
| PSC | C213 ARCHITECT AND ENGINEERING- GENERAL: INSPECTION (NON-CONSTRUCTION) |
| NAICS | 541330 ENGINEERING SERVICES |
| Obligated since Oct 2023 | $0 |
| Total obligated (lifetime) | $0 |
| Ceiling (base and all options) | $7.0M |
| Base date | Jun 3, 2021 |
| Latest action | Jan 8, 2024 |
| End date | n/a |
| Actions since Oct 2023 | 1 |
| Pricing | Set per order |
| Competition | Competed after exclusion of sources |
| Source | USAspending.gov record |
| Reporting lag | DoD 90 days |
| Award | Company | Obligated FY2024+ | What | Agency | Category | Latest action |
|---|---|---|---|---|---|---|
| FA282324F0419 delivery order | Peterson Engineering LLC | $817K | Bldg 374 guided weapons evaluation facility (gwef) upgrade hvac - correct fire protection system (fps) | Air Force | Real property maintenance and repair | Sep 19, 2024 DoD 90d |
| FA282326F0114 delivery order | Peterson Engineering LLC | $630K | Planning charrette report (pcr): upgrade/repair chillers, align genset and ats, building 380 | Air Force | Real property maintenance and repair | Jun 4, 2026 DoD 90d |
| FA282325F0058 delivery order | Peterson Engineering LLC | $337K | Provide new refrigerant transfer and storage system. | Air Force | Real property maintenance and repair | Mar 7, 2025 DoD 90d |
| FA282326F0117 delivery order | Peterson Engineering LLC | $277K | Design for upgrade / repair of chillers, align generator set and auto transfer switch in building 85 | Air Force | Real property maintenance and repair | Jun 4, 2026 DoD 90d |
| FA282324F0039 delivery order | Peterson Engineering LLC | $231K | Fy24 f18jc 374421 96cen fm9 (ftfa22cb17) dsn repair bldg 134 | Air Force | Real property maintenance and repair | Nov 29, 2023 DoD 90d |
| FA282324F0266 delivery order | Peterson Engineering LLC | $230K | Pziocb / design services to: repair hvac, controls, instrumentation, and fire protection systems comm b. 1425 for ftfa 23-vh70 | Air Force | Real property maintenance and repair | Aug 5, 2024 DoD 90d |
| FA282325F0188 delivery order | Peterson Engineering LLC | $230K | Design - update power/data/fiber grid site c-64 test areas | Air Force | Real property maintenance and repair | Jul 18, 2025 DoD 90d |
| FA282325F0108 delivery order | Peterson Engineering LLC | $225K | Design hvac system for bldg. 421 | Air Force | Real property maintenance and repair | Apr 30, 2025 DoD 90d |
| FA282324F0018 delivery order | Peterson Engineering LLC | $225K | Pziocb - fy24 f18jc 374421 96cen fm9 (ftfa171133) repair carpet, hvac, fire protection, electrical, abate asbestos bldg 229 | Air Force | Real property maintenance and repair | Oct 13, 2023 DoD 90d |
| FA282325F0039 delivery order | Peterson Engineering LLC | $224K | Design - replace multi hvac system with central hvac building 272 | Air Force | Real property maintenance and repair | Jan 30, 2025 DoD 90d |
| FA282324F0298 delivery order | Peterson Engineering LLC | $187K | Design add entire facility electrical load to generator, 7 special forces group facilities 4535, 4545, and 4570 | Air Force | Real property maintenance and repair | Aug 15, 2024 DoD 90d |
| FA282324F0284 delivery order | Peterson Engineering LLC | $178K | Design project - install counterpoise system on range c52-c4 | Air Force | Real property maintenance and repair | Aug 14, 2024 DoD 90d |
| FA282324F0017 delivery order | Peterson Engineering LLC | $150K | Pziocb - fy24 f18jc 374421 96 cen fm 9 (ftfa22pv22) dsn - repair hvac and fire protection, bldg 1315 | Air Force | Real property maintenance and repair | Oct 13, 2023 DoD 90d |
| FA282324F0422 delivery order | Peterson Engineering LLC | $113K | Design assessment and testing of the existing hvac and electrical system for building 351 | Air Force | Real property maintenance and repair | Sep 23, 2024 DoD 90d |
| FA282325F0033 delivery order | Peterson Engineering LLC | $93K | Bldg. 85 repair server rm 144 - hvac/crac systems | Air Force | Real property maintenance and repair | Jan 7, 2025 DoD 90d |
| FA282325F0187 delivery order | Peterson Engineering LLC | $91K | Full design for upgrade and modify hvac building 4545 | Air Force | Real property maintenance and repair | Jul 18, 2025 DoD 90d |
| FA282324F0385 delivery order | Peterson Engineering LLC | $87K | Design supplemental heating ventilation air conditioning system for nebula | Air Force | Real property maintenance and repair | Sep 16, 2024 DoD 90d |
| FA282324F0162 delivery order | Peterson Engineering LLC | $85K | Pziocb - lighting study for 96 mxg aircraft ramp | Air Force | Real property maintenance and repair | May 2, 2024 DoD 90d |
| FA282325F0338 delivery order | Peterson Engineering LLC | $83K | Charrette - fire suppression, detection, and annunciation for building 13 and 13a | Air Force | Real property maintenance and repair | Sep 19, 2025 DoD 90d |
| FA282324F0391 delivery order | Peterson Engineering LLC | $78K | Design uninterruptible power supply system to support the nature inspired research facility (nirf) bldg. 8683 ftfa 24vh44 | Air Force | Real property maintenance and repair | Sep 17, 2024 DoD 90d |
| FA282324F0255 delivery order | Peterson Engineering LLC | $73K | Bldg. 1327 repair fire suppression leaks | Air Force | Real property maintenance and repair | Jul 31, 2024 DoD 90d |
| FA282325F0135 delivery order | Peterson Engineering LLC | $51K | Design - redesign and replace hvac system with 2 new units bldg. 8683. | Air Force | Real property maintenance and repair | Jun 6, 2025 DoD 90d |
| FA282324F0243 delivery order | Peterson Engineering LLC | $49K | Repair update afff fire suppression system base hazmat pharmacy, bldg 1413 | Air Force | Real property maintenance and repair | Jul 23, 2024 DoD 90d |
| FA282325F0232 delivery order | Peterson Engineering LLC | $47K | Design install back-up generators for bak-12 aircraft arrest system at buildings 69000 and 69001 | Air Force | Real property maintenance and repair | Aug 13, 2025 DoD 90d |
| FA282325F0267 delivery order | Peterson Engineering LLC | $46K | Design - upgrade vehicle wash rack bldg. 4340 | Air Force | Real property maintenance and repair | Aug 26, 2025 DoD 90d |
| FA282323F0036 delivery order | Peterson Engineering LLC | $10K | Pziocb / ftfa 151157 re-design fire suppression system in building 71. | Air Force | Real property maintenance and repair | Dec 18, 2023 DoD 90d |
| FA282322F0390 delivery order | Peterson Engineering LLC | -$51K | Pziocb / design repair east gate service station tanks, piping, leaks b. 710 ftfa 22ad08 | Air Force | Real property maintenance and repair | Mar 27, 2024 DoD 90d |
Source: USAspending.gov prime award data (FPDS), DoD and DHS contracts, orders and IDVs with any action since Oct 1, 2023. Obligated FY2024+ sums the obligations on those actions; total obligated is the award's lifetime figure. DoD contract actions publish on USAspending about 90 days after signing (DFARS PGI 204.6), so the latest DoD actions here trail the calendar by about 3 months. Place of performance shows the state only.
Terminal: alerts on new orders and modifications to this contract, and CSV export.
7 days free for first-time subscribers, then $49/mo. Card required. Cancel before day 8 and you pay nothing.
Start free trial