Tracked vehiclesAnduril Enterprise 0.87% fill $173.4M / $20BCBP AST 46.50% fill $929.9M / $2.0BPalantir Maven 81.60% fill $637.6M / $781.3MShield AI USCG $61.4M drawn 12 ordersCounter-drone $2.1B drawn 25 C-UAS vehicles and awardsUSAspending compile · Oct 9 2026
AwardTape

AwardTape · Defense awards · Construction · New construction · FA255019DA003

FA255019DA003: $0 IDIQ contract to Olgoonik Enterprises, LLC

Olgoonik Enterprises, LLC holds an IDIQ contract from Department of the Air Force with $0 obligated since Oct 2023, against a ceiling of $200.0M. Latest action Feb 25, 2026.

Paving for colorado department of defense installations, includes maintaining and repairing existing paved and unpaved structures and constructing new paved and unpaved structures, including but not limited to paved and unpaved roadways, ...

PIIDFA255019DA003
TypeIDIQ contract
CompanyOlgoonik Enterprises, LLC
AgencyDepartment of the Air Force
Contracting officeFA2550 50 CONS PKP
CategoryConstruction · New construction
PSCY1LB CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS
NAICS237310 HIGHWAY, STREET, AND BRIDGE CONSTRUCTION
Obligated since Oct 2023$0
Total obligated (lifetime)$0
Ceiling (base and all options)$200.0M
Base dateFeb 22, 2019
Latest actionFeb 25, 2026
End daten/a
Actions since Oct 20233
PricingFirm fixed price
CompetitionCompeted after exclusion of sources
SourceUSAspending.gov record
Reporting lagDoD 90 days
Orders under this award29 orders · search
AwardCompanyObligated FY2024+WhatAgencyCategoryLatest action
FA255025F0063
delivery order
Olgoonik Enterprises, LLC$3.4MJoint forces paving for colorado department of defense installationsAir ForceReal property maintenance and repairMay 15, 2026
DoD 90d
FA254325F0037
delivery order
Olgoonik Enterprises, LLC$3.1MAspen st. rehab: asphalt overlay, crack repair, full-depth and curb/gutter work. multiple segments (keystone-steamboat, etc.). includes geo-membrane. see sow 7/3/25 for details/locations.Air ForceNew constructionSep 25, 2025
DoD 90d
FA251725F0035
delivery order
Olgoonik Enterprises, LLC$1.7MComplete all work iaw the sow dated 01/28/2025, and all attachments.Air ForceNew constructionApr 17, 2026
DoD 90d
W911RZ25FA061
delivery order
Olgoonik Enterprises, LLC$1.7MThe primary scope is to grade, prepare, amend soil, sod and/or seed the stie in and around the mckibben gym track. including landscaping rock, trees, sidewalks, and removal/replacement of the parking lot at building b1161.ArmyReal property maintenance and repairMay 28, 2026
DoD 90d
W911RZ24F0098
delivery order
Olgoonik Enterprises, LLC$1.4MDpw20-040 install pavementArmyArchitect-engineering servicesSep 25, 2025
DoD 90d
W911RZ25FA009
delivery order
Olgoonik Enterprises, LLC$895KProject ten23-011 involves repairing the parking lot at building 1140. the scope of work includes removing and replacing the concrete parking lot and sidewalk on the north side of the building.ArmyReal property maintenance and repairDec 29, 2025
DoD 90d
W911RZ24F0044
delivery order
Olgoonik Enterprises, LLC$779KRepair parking lot, building b1364 (dpw 24-015), fort carson, colorado. full depth repair of asphalt parking lot pavement. remove vault, repair subgrade, replace curb and gutter, replace base course, replace asphalt, install pavement ...ArmyReal property maintenance and repairDec 30, 2024
DoD 90d
W911RZ24F0029
delivery order
Olgoonik Enterprises, LLC$733KDpw24-010 b1664 parking lotArmyNew constructionSep 12, 2024
DoD 90d
W911RZ25FA056
delivery order
Olgoonik Enterprises, LLC$651KProject dpw25-004 consists of repair and replace fences on the property of b8030 on behalf of (dpw) at fort carson, colorado springs.ArmyReal property maintenance and repairMar 16, 2026
DoD 90d
W911RZ26FA020
delivery order
Olgoonik Enterprises, LLC$529KDpw24-009 imp, clover ditch trail: repair work on overlord road, install new concrete on stairs and walkways of foot bridges, and demo old foot bridges.ArmyReal property maintenance and repairJun 2, 2026
DoD 90d
W911RZ25FA049
delivery order
Olgoonik Enterprises, LLC$526KDpw19-067 involves repairing the parking lots, curbs, gutters, sidewalks, ada ramps at buildings 7494 and 7493. construction will also address subgrade and drainage issues. see the attached statement of work (sow) and drawings for specific ...ArmyReal property maintenance and repairMay 7, 2026
DoD 90d
W911RZ25FA006
delivery order
Olgoonik Enterprises, LLC$506KMill and overlay of asphalt pavement. deep strengthening, curb and gutter replacement, and drainage structure adjustments in select areas. the contractor shall adhere to construction drawings for all work locations, quantities, dimensions ...ArmyReal property maintenance and repairAug 25, 2025
DoD 90d
W911RZ24F0068
delivery order
Olgoonik Enterprises, LLC$486KDpw23-008 rpr, sec gravel parking lot b1ArmyNew constructionNov 6, 2024
DoD 90d
W911RZ24F0043
delivery order
Olgoonik Enterprises, LLC$457KDpw24-019 remove parking lot l-ervtArmyNew constructionSep 30, 2024
DoD 90d
W911RZ24F0053
delivery order
Olgoonik Enterprises, LLC$448KFt carson chapel sidewalk repair.ArmyNew constructionMay 19, 2025
DoD 90d
W911RZ25FA048
delivery order
Olgoonik Enterprises, LLC$389KProject dpw24-050 scope of work includes: landscape rock, fencing, trees, grass seed, and an irrigation system.ArmyReal property maintenance and repairMay 1, 2026
DoD 90d
FA254324F0007
delivery order
Olgoonik Enterprises, LLC$340KRepair maintain curb and gutter basewide fiscal year 2023Air ForceNew constructionFeb 20, 2024
DoD 90d
W911RZ25FA047
delivery order
Olgoonik Enterprises, LLC$336KDpw25-002 rpr, fy25 pw crack seals parking: extend the service life of asphalt pavement throughout fort carson by sealing existing cracks in specified roads and parking areas. targeted locations are identified in within the statement of ...ArmyReal property maintenance and repairDec 29, 2025
DoD 90d
W911RZ25FA032
delivery order
Olgoonik Enterprises, LLC$196KDpw23-043 rpr, bollards b1552/b1554ArmyReal property maintenance and repairOct 1, 2025
DoD 90d
W911RZ24F00A3
delivery order
Olgoonik Enterprises, LLC$183KDpw24-003 crack seal roads post wideArmyReal property maintenance and repairJan 25, 2025
DoD 90d
W911RZ22F0031
delivery order
Olgoonik Enterprises, LLC$146KDpw21-048 post-wide signal system upgrade on fort carsonArmyReal property maintenance and repairJun 3, 2024
DoD 90d
FA251723F0223
delivery order
Olgoonik Enterprises, LLC$41KPothole repair and paving for peterson space force baseAir ForceNew constructionApr 29, 2025
DoD 90d
FA251723F0146
delivery order
Olgoonik Enterprises, LLC$39KCrack and chip seal repair for cheyenne mountain roadsAir ForceNew constructionJun 26, 2024
DoD 90d
FA251723F0085
delivery order
Olgoonik Enterprises, LLC$0Joint forces paving for colorado department of defense installations: maintain ramp joint seal.Air ForceReal property maintenance and repairJun 21, 2024
DoD 90d
FA254321F0055
delivery order
Olgoonik Enterprises, LLC$0Repair stormwater ponds basewideAir ForceReal property maintenance and repairMar 20, 2025
DoD 90d
W911RZ23F0068
delivery order
Olgoonik Enterprises, LLC$0Dpw17-108 rpr, erosion and drainage swales multiArmyNew constructionApr 19, 2024
DoD 90d
W911RZ23F0084
delivery order
Olgoonik Enterprises, LLC$0Dpw23-003 sidewalksArmyNew constructionJun 11, 2024
DoD 90d
W911RZ23F0087
delivery order
Olgoonik Enterprises, LLC$0Civ22-002 rpr cement playground b2764ArmyNew constructionJul 10, 2024
DoD 90d
W911RZ23F0097
delivery order
Olgoonik Enterprises, LLC$0Dpw23-002 rpr, crack seal parking lot pwArmyNew constructionDec 8, 2023
DoD 90d
About this record

Source: USAspending.gov prime award data (FPDS), DoD and DHS contracts, orders and IDVs with any action since Oct 1, 2023. Obligated FY2024+ sums the obligations on those actions; total obligated is the award's lifetime figure. DoD contract actions publish on USAspending about 90 days after signing (DFARS PGI 204.6), so the latest DoD actions here trail the calendar by about 3 months. Place of performance shows the state only.

Terminal: alerts on new orders and modifications to this contract, and CSV export.

7 days free for first-time subscribers, then $49/mo. Card required. Cancel before day 8 and you pay nothing.

Start free trial