AwardTape · Defense awards · Construction · Real property maintenance and repair · 70B01C22A00000029
70B01C22A00000029: $0 blanket purchase agreement to Native Energy & Technology Inc
Native Energy & Technology Inc holds a blanket purchase agreement from U.S. Customs and Border Protection with $0 obligated since Oct 2023, against a ceiling of $22.2M. Latest action Sep 25, 2026.
Facility maintenance and repair program for the northwest corridor
| PIID | 70B01C22A00000029 |
|---|---|
| Type | blanket purchase agreement |
| Parent award | GS21F058AA |
| Company | Native Energy & Technology Inc |
| Agency | U.S. Customs and Border Protection |
| Contracting office | ADMINISTRATION FACILITIES TRAINING CONTRACTING DIVISION |
| Category | Construction · Real property maintenance and repair |
| PSC | Z1AZ MAINTENANCE OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS |
| NAICS | 561210 FACILITIES SUPPORT SERVICES |
| Obligated since Oct 2023 | $0 |
| Total obligated (lifetime) | $0 |
| Ceiling (base and all options) | $22.2M |
| Base date | Sep 26, 2026 |
| Latest action | Sep 25, 2026 |
| End date | n/a |
| Actions since Oct 2023 | 4 |
| Pricing | Set per order |
| Competition | Full and open competition |
| Source | USAspending.gov record |
| Reporting lag | Civilian, days |
| Award | Company | Obligated FY2024+ | What | Agency | Category | Latest action |
|---|---|---|---|---|---|---|
| 70B01C22F00001324 BPA call | Native Energy & Technology Inc | $11.7M | First bpa call order for the facility preventative maintenance and repair program for the northwest corridor | U.S. Customs and Border Protection | Real property maintenance and repair | Sep 25, 2026 |
| 70B01C26F00001082 BPA call | Native Energy & Technology Inc | $249K | Nw ups battery replacement | U.S. Customs and Border Protection | Real property maintenance and repair | Sep 17, 2026 |
| 70B01C24F00000244 BPA call | Native Energy & Technology Inc | $221K | The contractor shall provide/install 3 new boilers including all required supplies and electrical remove 3 current propane boilers and dispose of 2 non-functional boilers dismantle the third boiler securely package the equipment for ... | U.S. Customs and Border Protection | Real property maintenance and repair | Mar 26, 2024 |
| 70B01C25F00000534 BPA call | Native Energy & Technology Inc | $200K | The contractor shall modernize the elevators controller with the latest technology, replace or upgrade the drive system, etc in accordance with the sow. | U.S. Customs and Border Protection | Real property maintenance and repair | Sep 30, 2025 |
| 70B01C24F00001102 BPA call | Native Energy & Technology Inc | $90K | The contractor shall furnish/install/replace the water line system from city water connection to each of the four (4) buildings that have a water connection at curlew border patrol station. | U.S. Customs and Border Protection | New construction | Sep 26, 2024 |
| 70B01C24F00000821 BPA call | Native Energy & Technology Inc | $86K | The contractor, native energy and technology, llc., shall complete repairs to the lg multi v5 hp s1 hvac system and replace one fan center unit and install a new outdoor unit (odu) at colville bps | U.S. Customs and Border Protection | Real property maintenance and repair | Sep 4, 2024 |
| 70B01C26F00000079 BPA call | Native Energy & Technology Inc | $73K | The contractor, native energy and technology, llc., shall provide install/replace the lg multi v5 hp s1 hvac outdoor unit (odu) and make some hvac repairs at bonners ferry bps, in accordance with the sow. | U.S. Customs and Border Protection | Real property maintenance and repair | Jan 7, 2026 |
| 70B01C26F00001099 BPA call | Native Energy & Technology Inc | $63K | Tcs shall replace the lg multi v5 hp s2 hvac compressor and perform system evaluation on both lg hp units. | U.S. Customs and Border Protection | Real property maintenance and repair | Sep 18, 2026 |
| 70B01C24F00001111 BPA call | Native Energy & Technology Inc | $48K | The contractor shall remove and replace the two (2) current hvac units (furnace and air conditioner) at the leca building on havre border patrol sector hq location. | U.S. Customs and Border Protection | Furnaces, boilers and reactors | Sep 30, 2024 |
| 70B01C24F00000311 BPA call | Native Energy & Technology Inc | $38K | Replace the two (2) sallyport gate operators at blaine bps annex /detention building | U.S. Customs and Border Protection | Real property maintenance and repair | May 1, 2024 |
| 70B01C25F00001128 BPA call | Native Energy & Technology Inc | $31K | The contractor shall provide frp(to)blw blh paw install fire alarms. | U.S. Customs and Border Protection | Quality control, testing and inspection | Sep 19, 2025 |
| 70B01C25F00000352 BPA call | Native Energy & Technology Inc | $28K | The contractor shall remove and dispose of spent a/c unit, provide and install a new mini-split. | U.S. Customs and Border Protection | Real property maintenance and repair | May 1, 2025 |
| 70B01C24F00000225 BPA call | Native Energy & Technology Inc | $22K | Install generac protector series 60 kva generator (model: generac rg06024avax) and transfer switch. removal and disposal of the old generator and transfer switch and testing. | U.S. Customs and Border Protection | Real property maintenance and repair | Jul 25, 2025 |
| 70B01C23F00001304 BPA call | Native Energy & Technology Inc | $0 | Install generator replacement - metaline | U.S. Customs and Border Protection | Real property maintenance and repair | Apr 10, 2024 |
| 70B01C23F00000993 BPA call | Native Energy & Technology Inc | -$540 | Replace server racks - grand forks nasoc | U.S. Customs and Border Protection | Real property maintenance and repair | Jan 31, 2025 |
| 70B01C23F00001019 BPA call | Native Energy & Technology Inc | -$1.1K | Replace power off-grid system, polebridge fob montana | U.S. Customs and Border Protection | Real property maintenance and repair | Jul 25, 2025 |
| 70B01C23F00000743 BPA call | Native Energy & Technology Inc | -$2.4K | Replace gate | U.S. Customs and Border Protection | Real property maintenance and repair | Mar 5, 2025 |
| 70B01C23F00000530 BPA call | Native Energy & Technology Inc | -$7.1K | Hvac balancing | U.S. Customs and Border Protection | Real property maintenance and repair | Jun 3, 2026 |
| 70B01C23F00000432 BPA call | Native Energy & Technology Inc | -$9.3K | The contractor shall repair the main septic line and rebuild any areas that were affected during the repair to include resetting electrical box that has started to settle into the ground. | U.S. Customs and Border Protection | Real property maintenance and repair | Mar 10, 2025 |
| 70B01C23F00000529 BPA call | Native Energy & Technology Inc | -$331K | Replace the trane heat pump model cgam 090f serving the bellingham border patrol station and replace IT with a backup chiller. | U.S. Customs and Border Protection | Real property maintenance and repair | Jun 3, 2026 |
| 70B01C23F00000526 BPA call | Native Energy & Technology Inc | -$403K | Port angeles border patrol station chiller unit | U.S. Customs and Border Protection | Real property maintenance and repair | Jun 3, 2026 |
Source: USAspending.gov prime award data (FPDS), DoD and DHS contracts, orders and IDVs with any action since Oct 1, 2023. Obligated FY2024+ sums the obligations on those actions; total obligated is the award's lifetime figure. Place of performance shows the state only.
Terminal: alerts on new orders and modifications to this contract, and CSV export.
7 days free for first-time subscribers, then $49/mo. Card required. Cancel before day 8 and you pay nothing.
Start free trial