{"ok":true,"desk":"grid_interconnection_queue","as_of":"2026-10-26","tier":"free_preview_50","total_matched":533,"returned":50,"total_matched_mw":110312.5,"filters":{"iso":null,"q":null,"min_mw":null},"full_access_checkout":"https://awardtape.com/api/billing/checkout?plan=csv_pack","rows":[{"id":"GRID-NYISO-L-1743","iso_rto":"NYISO","queue_id":"NYISO-L-1743","project_name":"St. Lawrence Infrastructure 2 (NYPA)","developer_or_entity":"St. Lawrence Infrastructure, LLC","county":"St. Lawrence","state":"NY","substation_or_poi":"NYPA's 230kV Moses Massena 1 (MMS-1) and 230kV Moses Massena 2 (MMS-2)","voltage_kv":230,"capacity_mw":1935,"fuel_or_tech_type":"Large Industrial / DOE Load","status":"Active Load Interconnection","queue_date":"2025-09-02","target_cod":"2027-12-01","upgrade_cost_est_usd":131580000,"transformer_lead_risk":"30-42 Months (345kV/115kV Large Power Transformer)","commercial_trigger":"DATA CENTER / LARGE LOAD INTERCONNECTION","monetize_note":"1935 MW large load interconnection at NYPA's 230kV Moses Massena 1 (MMS-1) and 230kV Moses Massena 2 (MMS-2) (230kV) — developer requires dedicated HV substation step-down transformers, GIS switchgear, and behind-the-meter backup generation.","source_url":"https://www.nyiso.com/interconnections","updated_at":"2026-10-26T17:26:48Z"},{"id":"GRID-MISO-J4409","iso_rto":"MISO","queue_id":"J4409","project_name":"MISO J4409 — DUKE ENERGY INDIANA, LLC CIN Substation (Solar / Battery Storage)","developer_or_entity":"DUKE ENERGY INDIANA, LLC CIN","county":"Regional","state":"TX","substation_or_poi":"DUKE ENERGY INDIANA, LLC CIN Substation","voltage_kv":345,"capacity_mw":1440,"fuel_or_tech_type":"Solar / Battery Storage","status":"Active (Active)","queue_date":"2026-09-04","target_cod":"2031-10-01","upgrade_cost_est_usd":122400000,"transformer_lead_risk":"36-48 Months (345kV-500kV GSU Transformer Bottleneck)","commercial_trigger":"TRANSFORMER BOTTLENECK (24-36M LEAD)","monetize_note":"Utility-scale 1440 MW (Solar / Battery Storage) interconnection on 345kV bus — long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).","source_url":"https://www.misoenergy.org/planning/resource-utilization/GI_Queue/","updated_at":"2026-10-26T17:26:48Z"},{"id":"GRID-MISO-J4331","iso_rto":"MISO","queue_id":"J4331","project_name":"MISO J4331 — ITC MIDWEST Substation (Solar / Battery Storage)","developer_or_entity":"ITC MIDWEST","county":"Regional","state":"TX","substation_or_poi":"ITC MIDWEST Substation","voltage_kv":345,"capacity_mw":1435,"fuel_or_tech_type":"Solar / Battery Storage","status":"Active (Active)","queue_date":"2026-09-01","target_cod":"2031-06-30","upgrade_cost_est_usd":121975000,"transformer_lead_risk":"36-48 Months (345kV-500kV GSU Transformer Bottleneck)","commercial_trigger":"TRANSFORMER BOTTLENECK (24-36M LEAD)","monetize_note":"Utility-scale 1435 MW (Solar / Battery Storage) interconnection on 345kV bus — long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).","source_url":"https://www.misoenergy.org/planning/resource-utilization/GI_Queue/","updated_at":"2026-10-26T17:26:48Z"},{"id":"GRID-NYISO-C24003","iso_rto":"NYISO","queue_id":"C24-003","project_name":"Vineyard Mid-Atlantic West (NYPA)","developer_or_entity":"Vineyard Mid-Atlantic LLC","county":"Nassu","state":"NY","substation_or_poi":"East Garden City 345kV","voltage_kv":345,"capacity_mw":1321,"fuel_or_tech_type":"Offshore Wind","status":"Active Cluster Study","queue_date":"2024-08-01","target_cod":"2028-06-01","upgrade_cost_est_usd":112285000,"transformer_lead_risk":"36-48 Months (345kV-500kV GSU Transformer Bottleneck)","commercial_trigger":"TRANSFORMER BOTTLENECK (24-36M LEAD)","monetize_note":"Utility-scale 1321 MW (Offshore Wind) interconnection on 345kV bus — long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).","source_url":"https://www.nyiso.com/interconnections","updated_at":"2026-10-26T17:26:48Z"},{"id":"GRID-NYISO-C24021","iso_rto":"NYISO","queue_id":"C24-021","project_name":"Bluepoint Wind 1 (CONED)","developer_or_entity":"Bluepoint Wind LLC","county":"Kings","state":"NY","substation_or_poi":"Brooklyn Clean Energy Hub 345kV Substation","voltage_kv":345,"capacity_mw":1310,"fuel_or_tech_type":"Offshore Wind","status":"Active Cluster Study","queue_date":"2024-08-01","target_cod":"2028-06-01","upgrade_cost_est_usd":111350000,"transformer_lead_risk":"36-48 Months (345kV-500kV GSU Transformer Bottleneck)","commercial_trigger":"TRANSFORMER BOTTLENECK (24-36M LEAD)","monetize_note":"Utility-scale 1310 MW (Offshore Wind) interconnection on 345kV bus — long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).","source_url":"https://www.nyiso.com/interconnections","updated_at":"2026-10-26T17:26:48Z"},{"id":"GRID-NYISO-L-1757","iso_rto":"NYISO","queue_id":"NYISO-L-1757","project_name":"NY-Route 9W Load Center (National Grid)","developer_or_entity":"NY-Route 9W LLC","county":"Greene","state":"NY","substation_or_poi":"Leeds 345kV substation","voltage_kv":345,"capacity_mw":1000,"fuel_or_tech_type":"Large Load / AI Data Center & Industrial","status":"Active Load Interconnection","queue_date":"2026-01-07","target_cod":"2027-12-01","upgrade_cost_est_usd":68000000,"transformer_lead_risk":"30-42 Months (345kV/115kV Large Power Transformer)","commercial_trigger":"DATA CENTER / LARGE LOAD INTERCONNECTION","monetize_note":"1000 MW large load interconnection at Leeds 345kV substation (345kV) — developer requires dedicated HV substation step-down transformers, GIS switchgear, and behind-the-meter backup generation.","source_url":"https://www.nyiso.com/interconnections","updated_at":"2026-10-26T17:26:48Z"},{"id":"GRID-NYISO-L-1738","iso_rto":"NYISO","queue_id":"NYISO-L-1738","project_name":"1 Gig Data Center East Fishkill, NY (CONED)","developer_or_entity":"Donovan Drive Holdings LLC","county":"Dutchess","state":"NY","substation_or_poi":"East Fishkill to Wood Street 345 kV lines (38 and 39)","voltage_kv":345,"capacity_mw":1000,"fuel_or_tech_type":"Large Load / AI Data Center & Industrial","status":"Active Load Interconnection","queue_date":"2025-07-17","target_cod":"2027-12-01","upgrade_cost_est_usd":68000000,"transformer_lead_risk":"30-42 Months (345kV/115kV Large Power Transformer)","commercial_trigger":"DATA CENTER / LARGE LOAD INTERCONNECTION","monetize_note":"1000 MW large load interconnection at East Fishkill to Wood Street 345 kV lines (38 and 39) (345kV) — developer requires dedicated HV substation step-down transformers, GIS switchgear, and behind-the-meter backup generation.","source_url":"https://www.nyiso.com/interconnections","updated_at":"2026-10-26T17:26:48Z"},{"id":"GRID-MISO-J4342","iso_rto":"MISO","queue_id":"J4342","project_name":"MISO J4342 — NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS Substation (Solar / Battery Storage)","developer_or_entity":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS","county":"Regional","state":"TX","substation_or_poi":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS Substation","voltage_kv":345,"capacity_mw":976.1,"fuel_or_tech_type":"Solar / Battery Storage","status":"Active (Active)","queue_date":"2026-09-09","target_cod":"2031-05-02","upgrade_cost_est_usd":82968500,"transformer_lead_risk":"36-48 Months (345kV-500kV GSU Transformer Bottleneck)","commercial_trigger":"TRANSFORMER BOTTLENECK (24-36M LEAD)","monetize_note":"Utility-scale 976 MW (Solar / Battery Storage) interconnection on 345kV bus — long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).","source_url":"https://www.misoenergy.org/planning/resource-utilization/GI_Queue/","updated_at":"2026-10-26T17:26:48Z"},{"id":"GRID-MISO-J4324","iso_rto":"MISO","queue_id":"J4324","project_name":"MISO J4324 — NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS Substation (Solar / Battery Storage)","developer_or_entity":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS","county":"Starke","state":"TX","substation_or_poi":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS Substation","voltage_kv":345,"capacity_mw":976.1,"fuel_or_tech_type":"Solar / Battery Storage","status":"Active (Active)","queue_date":"2026-09-09","target_cod":"2031-05-02","upgrade_cost_est_usd":82968500,"transformer_lead_risk":"36-48 Months (345kV-500kV GSU Transformer Bottleneck)","commercial_trigger":"TRANSFORMER BOTTLENECK (24-36M LEAD)","monetize_note":"Utility-scale 976 MW (Solar / Battery Storage) interconnection on 345kV bus — long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).","source_url":"https://www.misoenergy.org/planning/resource-utilization/GI_Queue/","updated_at":"2026-10-26T17:26:48Z"},{"id":"GRID-MISO-J4298","iso_rto":"MISO","queue_id":"J4298","project_name":"MISO J4298 — DUKE ENERGY INDIANA, LLC CIN Substation (Solar / Battery Storage)","developer_or_entity":"DUKE ENERGY INDIANA, LLC CIN","county":"Regional","state":"TX","substation_or_poi":"DUKE ENERGY INDIANA, LLC CIN Substation","voltage_kv":345,"capacity_mw":976.1,"fuel_or_tech_type":"Solar / Battery Storage","status":"Active (Active)","queue_date":"2026-09-08","target_cod":"2031-05-02","upgrade_cost_est_usd":82968500,"transformer_lead_risk":"36-48 Months (345kV-500kV GSU Transformer Bottleneck)","commercial_trigger":"TRANSFORMER BOTTLENECK (24-36M LEAD)","monetize_note":"Utility-scale 976 MW (Solar / Battery Storage) interconnection on 345kV bus — long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).","source_url":"https://www.misoenergy.org/planning/resource-utilization/GI_Queue/","updated_at":"2026-10-26T17:26:48Z"},{"id":"GRID-MISO-J4369","iso_rto":"MISO","queue_id":"J4369","project_name":"MISO J4369 — MIDAMERICAN ENERGY CO. MEC Substation (Solar / Battery Storage)","developer_or_entity":"MIDAMERICAN ENERGY CO. MEC","county":"Regional","state":"TX","substation_or_poi":"MIDAMERICAN ENERGY CO. MEC Substation","voltage_kv":345,"capacity_mw":950,"fuel_or_tech_type":"Solar / Battery Storage","status":"Active (Active)","queue_date":"2026-09-01","target_cod":"2031-06-30","upgrade_cost_est_usd":80750000,"transformer_lead_risk":"36-48 Months (345kV-500kV GSU Transformer Bottleneck)","commercial_trigger":"TRANSFORMER BOTTLENECK (24-36M LEAD)","monetize_note":"Utility-scale 950 MW (Solar / Battery Storage) interconnection on 345kV bus — long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).","source_url":"https://www.misoenergy.org/planning/resource-utilization/GI_Queue/","updated_at":"2026-10-26T17:26:48Z"},{"id":"GRID-NYISO-L-1742","iso_rto":"NYISO","queue_id":"NYISO-L-1742","project_name":"St. Lawrence Infrastructure 1 (NYPA)","developer_or_entity":"St. Lawrence Infrastructure, LLC","county":"St. Lawrence","state":"NY","substation_or_poi":"NYPA HA-2, 345kV Transmission Line","voltage_kv":345,"capacity_mw":860,"fuel_or_tech_type":"Large Industrial / DOE Load","status":"Active Load Interconnection","queue_date":"2025-09-02","target_cod":"2027-12-01","upgrade_cost_est_usd":58480000,"transformer_lead_risk":"30-42 Months (345kV/115kV Large Power Transformer)","commercial_trigger":"DATA CENTER / LARGE LOAD INTERCONNECTION","monetize_note":"860 MW large load interconnection at NYPA HA-2, 345kV Transmission Line (345kV) — developer requires dedicated HV substation step-down transformers, GIS switchgear, and behind-the-meter backup generation.","source_url":"https://www.nyiso.com/interconnections","updated_at":"2026-10-26T17:26:48Z"},{"id":"GRID-MISO-J4299","iso_rto":"MISO","queue_id":"J4299","project_name":"MISO J4299 — CLECO POWER LLC CLEC Substation (Solar / Battery Storage)","developer_or_entity":"CLECO POWER LLC CLEC","county":"Regional","state":"TX","substation_or_poi":"CLECO POWER LLC CLEC Substation","voltage_kv":345,"capacity_mw":770,"fuel_or_tech_type":"Solar / Battery Storage","status":"Active (Active)","queue_date":"2026-09-09","target_cod":"2031-05-02","upgrade_cost_est_usd":65450000,"transformer_lead_risk":"36-48 Months (345kV-500kV GSU Transformer Bottleneck)","commercial_trigger":"TRANSFORMER BOTTLENECK (24-36M LEAD)","monetize_note":"Utility-scale 770 MW (Solar / Battery Storage) interconnection on 345kV bus — long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).","source_url":"https://www.misoenergy.org/planning/resource-utilization/GI_Queue/","updated_at":"2026-10-26T17:26:48Z"},{"id":"GRID-MISO-J4384","iso_rto":"MISO","queue_id":"J4384","project_name":"MISO J4384 — MISO Transmission Owner Substation (Solar / Battery Storage)","developer_or_entity":"MISO Transmission Owner","county":"Regional","state":"TX","substation_or_poi":"MISO Transmission Owner Substation","voltage_kv":345,"capacity_mw":770,"fuel_or_tech_type":"Solar / Battery Storage","status":"Active (Active)","queue_date":"2026-09-09","target_cod":"2031-12-31","upgrade_cost_est_usd":65450000,"transformer_lead_risk":"36-48 Months (345kV-500kV GSU Transformer Bottleneck)","commercial_trigger":"TRANSFORMER BOTTLENECK (24-36M LEAD)","monetize_note":"Utility-scale 770 MW (Solar / Battery Storage) interconnection on 345kV bus — long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).","source_url":"https://www.misoenergy.org/planning/resource-utilization/GI_Queue/","updated_at":"2026-10-26T17:26:48Z"},{"id":"GRID-MISO-J4339","iso_rto":"MISO","queue_id":"J4339","project_name":"MISO J4339 — DUKE ENERGY INDIANA, LLC CIN Substation (Solar / Battery Storage)","developer_or_entity":"DUKE ENERGY INDIANA, LLC CIN","county":"Regional","state":"TX","substation_or_poi":"DUKE ENERGY INDIANA, LLC CIN Substation","voltage_kv":345,"capacity_mw":770,"fuel_or_tech_type":"Solar / Battery Storage","status":"Active (Active)","queue_date":"2026-09-08","target_cod":"2031-05-02","upgrade_cost_est_usd":65450000,"transformer_lead_risk":"36-48 Months (345kV-500kV GSU Transformer Bottleneck)","commercial_trigger":"TRANSFORMER BOTTLENECK (24-36M LEAD)","monetize_note":"Utility-scale 770 MW (Solar / Battery Storage) interconnection on 345kV bus — long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).","source_url":"https://www.misoenergy.org/planning/resource-utilization/GI_Queue/","updated_at":"2026-10-26T17:26:48Z"},{"id":"GRID-MISO-J4307","iso_rto":"MISO","queue_id":"J4307","project_name":"MISO J4307 — ENTERGY LOUISIANA, LLC ELTO Substation (Solar / Battery Storage)","developer_or_entity":"ENTERGY LOUISIANA, LLC ELTO","county":"Regional","state":"TX","substation_or_poi":"ENTERGY LOUISIANA, LLC ELTO Substation","voltage_kv":345,"capacity_mw":720,"fuel_or_tech_type":"Solar / Battery Storage","status":"Active (Active)","queue_date":"2026-09-09","target_cod":"2031-12-01","upgrade_cost_est_usd":61200000,"transformer_lead_risk":"36-48 Months (345kV-500kV GSU Transformer Bottleneck)","commercial_trigger":"TRANSFORMER BOTTLENECK (24-36M LEAD)","monetize_note":"Utility-scale 720 MW (Solar / Battery Storage) interconnection on 345kV bus — long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).","source_url":"https://www.misoenergy.org/planning/resource-utilization/GI_Queue/","updated_at":"2026-10-26T17:26:48Z"},{"id":"GRID-NYISO-C260053","iso_rto":"NYISO","queue_id":"C26-0053","project_name":"EF Barrett - 2 (NY Transco)","developer_or_entity":"NGV Barrett Energy Center LLC","county":"Nassau","state":"NY","substation_or_poi":"(New) 345 kV Barrett Propel Substation","voltage_kv":345,"capacity_mw":626.9,"fuel_or_tech_type":"CC","status":"Active Cluster Study","queue_date":"2026-09-08","target_cod":"2028-06-01","upgrade_cost_est_usd":53286500,"transformer_lead_risk":"36-48 Months (345kV-500kV GSU Transformer Bottleneck)","commercial_trigger":"TRANSFORMER BOTTLENECK (24-36M LEAD)","monetize_note":"Utility-scale 626 MW (CC) interconnection on 345kV bus — long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).","source_url":"https://www.nyiso.com/interconnections","updated_at":"2026-10-26T17:26:48Z"},{"id":"GRID-NYISO-C2600011","iso_rto":"NYISO","queue_id":"C26-0001-1","project_name":"EVERGREEN RIDGE POWER (NYSEG)","developer_or_entity":"Evergreen Ridge Power, LLC","county":"TIOGA","state":"PA","substation_or_poi":"Mainesburg 345 kV to Homer City 345 kV Circuit ID -1","voltage_kv":345,"capacity_mw":624,"fuel_or_tech_type":"CC","status":"Active Cluster Study","queue_date":"2026-07-31","target_cod":"2028-06-01","upgrade_cost_est_usd":53040000,"transformer_lead_risk":"36-48 Months (345kV-500kV GSU Transformer Bottleneck)","commercial_trigger":"TRANSFORMER BOTTLENECK (24-36M LEAD)","monetize_note":"Utility-scale 624 MW (CC) interconnection on 345kV bus — long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).","source_url":"https://www.nyiso.com/interconnections","updated_at":"2026-10-26T17:26:48Z"},{"id":"GRID-NYISO-L-1765","iso_rto":"NYISO","queue_id":"NYISO-L-1765","project_name":"Micron Fab 3 (National Grid)","developer_or_entity":"Eldo Varghese","county":"Onondaga","state":"Ne","substation_or_poi":"National Grid - Clay Substation","voltage_kv":345,"capacity_mw":606,"fuel_or_tech_type":"Semiconductor Fab Load","status":"Active Load Interconnection","queue_date":"2026-08-28","target_cod":"2027-12-01","upgrade_cost_est_usd":41208000,"transformer_lead_risk":"30-42 Months (345kV/115kV Large Power Transformer)","commercial_trigger":"DATA CENTER / LARGE LOAD INTERCONNECTION","monetize_note":"606 MW large load interconnection at National Grid - Clay Substation (345kV) — developer requires dedicated HV substation step-down transformers, GIS switchgear, and behind-the-meter backup generation.","source_url":"https://www.nyiso.com/interconnections","updated_at":"2026-10-26T17:26:48Z"},{"id":"GRID-NYISO-L-1627","iso_rto":"NYISO","queue_id":"NYISO-L-1627","project_name":"Micron Fab 2 (NM-NG)","developer_or_entity":"Micron New York Semiconductor Manufacturing LLC","county":"Onondaga","state":"NY","substation_or_poi":"National Grid Clay 345 kV Substation","voltage_kv":345,"capacity_mw":576,"fuel_or_tech_type":"Semiconductor Fab Load","status":"Active Load Interconnection","queue_date":"2023-10-31","target_cod":"2027-12-01","upgrade_cost_est_usd":39168000,"transformer_lead_risk":"30-42 Months (345kV/115kV Large Power Transformer)","commercial_trigger":"DATA CENTER / LARGE LOAD INTERCONNECTION","monetize_note":"576 MW large load interconnection at National Grid Clay 345 kV Substation (345kV) — developer requires dedicated HV substation step-down transformers, GIS switchgear, and behind-the-meter backup generation.","source_url":"https://www.nyiso.com/interconnections","updated_at":"2026-10-26T17:26:48Z"},{"id":"GRID-MISO-J4406","iso_rto":"MISO","queue_id":"J4406","project_name":"MISO J4406 — MISO Transmission Owner Substation (Solar / Battery Storage)","developer_or_entity":"MISO Transmission Owner","county":"Regional","state":"TX","substation_or_poi":"MISO Transmission Owner Substation","voltage_kv":345,"capacity_mw":524,"fuel_or_tech_type":"Solar / Battery Storage","status":"Active (Active)","queue_date":"2026-09-09","target_cod":"2030-09-01","upgrade_cost_est_usd":44536600,"transformer_lead_risk":"36-48 Months (345kV-500kV GSU Transformer Bottleneck)","commercial_trigger":"TRANSFORMER BOTTLENECK (24-36M LEAD)","monetize_note":"Utility-scale 523 MW (Solar / Battery Storage) interconnection on 345kV bus — long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).","source_url":"https://www.misoenergy.org/planning/resource-utilization/GI_Queue/","updated_at":"2026-10-26T17:26:48Z"},{"id":"GRID-MISO-J4322","iso_rto":"MISO","queue_id":"J4322","project_name":"MISO J4322 — ENTERGY ARKANSAS, LLC EATO Substation (Solar / Battery Storage)","developer_or_entity":"ENTERGY ARKANSAS, LLC EATO","county":"Regional","state":"TX","substation_or_poi":"ENTERGY ARKANSAS, LLC EATO Substation","voltage_kv":345,"capacity_mw":500,"fuel_or_tech_type":"Solar / Battery Storage","status":"Active (Active)","queue_date":"2026-09-10","target_cod":"2030-04-01","upgrade_cost_est_usd":42500000,"transformer_lead_risk":"36-48 Months (345kV-500kV GSU Transformer Bottleneck)","commercial_trigger":"TRANSFORMER BOTTLENECK (24-36M LEAD)","monetize_note":"Utility-scale 500 MW (Solar / Battery Storage) interconnection on 345kV bus — long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).","source_url":"https://www.misoenergy.org/planning/resource-utilization/GI_Queue/","updated_at":"2026-10-26T17:26:48Z"},{"id":"GRID-MISO-J4381","iso_rto":"MISO","queue_id":"J4381","project_name":"MISO J4381 — MIDAMERICAN ENERGY CO. MEC Substation (Solar / Battery Storage)","developer_or_entity":"MIDAMERICAN ENERGY CO. MEC","county":"Regional","state":"TX","substation_or_poi":"MIDAMERICAN ENERGY CO. MEC Substation","voltage_kv":345,"capacity_mw":500,"fuel_or_tech_type":"Solar / Battery Storage","status":"Active (Active)","queue_date":"2026-09-10","target_cod":"2030-05-30","upgrade_cost_est_usd":42500000,"transformer_lead_risk":"36-48 Months (345kV-500kV GSU Transformer Bottleneck)","commercial_trigger":"TRANSFORMER BOTTLENECK (24-36M LEAD)","monetize_note":"Utility-scale 500 MW (Solar / Battery Storage) interconnection on 345kV bus — long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).","source_url":"https://www.misoenergy.org/planning/resource-utilization/GI_Queue/","updated_at":"2026-10-26T17:26:48Z"},{"id":"GRID-MISO-J4355","iso_rto":"MISO","queue_id":"J4355","project_name":"MISO J4355 — Cedar Mountain - Lyon County 345.0kV (Solar / Battery Storage)","developer_or_entity":"MINNESOTA MUNICIPAL POWER AGENCY M2PA","county":"Redwood","state":"TX","substation_or_poi":"Cedar Mountain - Lyon County 345.0kV","voltage_kv":345,"capacity_mw":500,"fuel_or_tech_type":"Solar / Battery Storage","status":"Active (Active)","queue_date":"2026-09-09","target_cod":"2031-09-30","upgrade_cost_est_usd":42500000,"transformer_lead_risk":"36-48 Months (345kV-500kV GSU Transformer Bottleneck)","commercial_trigger":"TRANSFORMER BOTTLENECK (24-36M LEAD)","monetize_note":"Utility-scale 500 MW (Solar / Battery Storage) interconnection on 345kV bus — long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).","source_url":"https://www.misoenergy.org/planning/resource-utilization/GI_Queue/","updated_at":"2026-10-26T17:26:48Z"},{"id":"GRID-MISO-J4343","iso_rto":"MISO","queue_id":"J4343","project_name":"MISO J4343 — Cedar Mountain - Lyon County 345.0kV (Solar / Battery Storage)","developer_or_entity":"AMEREN ILLINOIS","county":"Redwood","state":"TX","substation_or_poi":"Cedar Mountain - Lyon County 345.0kV","voltage_kv":345,"capacity_mw":500,"fuel_or_tech_type":"Solar / Battery Storage","status":"Active (Active)","queue_date":"2026-09-09","target_cod":"2031-09-30","upgrade_cost_est_usd":42500000,"transformer_lead_risk":"36-48 Months (345kV-500kV GSU Transformer Bottleneck)","commercial_trigger":"TRANSFORMER BOTTLENECK (24-36M LEAD)","monetize_note":"Utility-scale 500 MW (Solar / Battery Storage) interconnection on 345kV bus — long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).","source_url":"https://www.misoenergy.org/planning/resource-utilization/GI_Queue/","updated_at":"2026-10-26T17:26:48Z"},{"id":"GRID-MISO-J4408","iso_rto":"MISO","queue_id":"J4408","project_name":"MISO J4408 — NORTHERN STATES POWER COMPANY Substation (Solar / Battery Storage)","developer_or_entity":"NORTHERN STATES POWER COMPANY","county":"Regional","state":"TX","substation_or_poi":"NORTHERN STATES POWER COMPANY Substation","voltage_kv":345,"capacity_mw":500,"fuel_or_tech_type":"Solar / Battery Storage","status":"Active (Active)","queue_date":"2026-09-04","target_cod":"2031-07-01","upgrade_cost_est_usd":42500000,"transformer_lead_risk":"36-48 Months (345kV-500kV GSU Transformer Bottleneck)","commercial_trigger":"TRANSFORMER BOTTLENECK (24-36M LEAD)","monetize_note":"Utility-scale 500 MW (Solar / Battery Storage) interconnection on 345kV bus — long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).","source_url":"https://www.misoenergy.org/planning/resource-utilization/GI_Queue/","updated_at":"2026-10-26T17:26:48Z"},{"id":"GRID-NYISO-C260042","iso_rto":"NYISO","queue_id":"C26-0042","project_name":"Adirondack Energy Storage Center (NYPA)","developer_or_entity":"Adirondack Energy Storage LLC","county":"Lewis County","state":"NY","substation_or_poi":"Adirondack 345kV substation","voltage_kv":345,"capacity_mw":500,"fuel_or_tech_type":"Battery Energy Storage (BESS)","status":"Active Cluster Study","queue_date":"2026-08-27","target_cod":"2028-06-01","upgrade_cost_est_usd":42500000,"transformer_lead_risk":"36-48 Months (345kV-500kV GSU Transformer Bottleneck)","commercial_trigger":"TRANSFORMER BOTTLENECK (24-36M LEAD)","monetize_note":"Utility-scale 500 MW (Battery Energy Storage (BESS)) interconnection on 345kV bus — long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).","source_url":"https://www.nyiso.com/interconnections","updated_at":"2026-10-26T17:26:48Z"},{"id":"GRID-NYISO-L-1741","iso_rto":"NYISO","queue_id":"NYISO-L-1741","project_name":"North East Data LLC Data Center (NM-NG)","developer_or_entity":"North East Data LLC","county":"Niagara","state":"NY","substation_or_poi":"230kV lines 77 and 78","voltage_kv":230,"capacity_mw":500,"fuel_or_tech_type":"Large Load / AI Data Center & Industrial","status":"Active Load Interconnection","queue_date":"2025-08-29","target_cod":"2027-12-01","upgrade_cost_est_usd":34000000,"transformer_lead_risk":"30-42 Months (345kV/115kV Large Power Transformer)","commercial_trigger":"DATA CENTER / LARGE LOAD INTERCONNECTION","monetize_note":"500 MW large load interconnection at 230kV lines 77 and 78 (230kV) — developer requires dedicated HV substation step-down transformers, GIS switchgear, and behind-the-meter backup generation.","source_url":"https://www.nyiso.com/interconnections","updated_at":"2026-10-26T17:26:48Z"},{"id":"GRID-MISO-J4388","iso_rto":"MISO","queue_id":"J4388","project_name":"MISO J4388 — MISO Transmission Owner Substation (Solar / Battery Storage)","developer_or_entity":"MISO Transmission Owner","county":"Regional","state":"TX","substation_or_poi":"MISO Transmission Owner Substation","voltage_kv":345,"capacity_mw":499,"fuel_or_tech_type":"Solar / Battery Storage","status":"Active (Active)","queue_date":"2026-09-12","target_cod":"2028-02-01","upgrade_cost_est_usd":42415000,"transformer_lead_risk":"36-48 Months (345kV-500kV GSU Transformer Bottleneck)","commercial_trigger":"TRANSFORMER BOTTLENECK (24-36M LEAD)","monetize_note":"Utility-scale 499 MW (Solar / Battery Storage) interconnection on 345kV bus — long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).","source_url":"https://www.misoenergy.org/planning/resource-utilization/GI_Queue/","updated_at":"2026-10-26T17:26:48Z"},{"id":"GRID-MISO-J4404","iso_rto":"MISO","queue_id":"J4404","project_name":"MISO J4404 — NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS Substation (Solar / Battery Storage)","developer_or_entity":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS","county":"Regional","state":"TX","substation_or_poi":"NORTHERN INDIANA PUBLIC SERVICE COMPANY LLC NIPS Substation","voltage_kv":345,"capacity_mw":490,"fuel_or_tech_type":"Solar / Battery Storage","status":"Active (Active)","queue_date":"2026-09-10","target_cod":"2031-11-30","upgrade_cost_est_usd":41650000,"transformer_lead_risk":"36-48 Months (345kV-500kV GSU Transformer Bottleneck)","commercial_trigger":"TRANSFORMER BOTTLENECK (24-36M LEAD)","monetize_note":"Utility-scale 490 MW (Solar / Battery Storage) interconnection on 345kV bus — long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).","source_url":"https://www.misoenergy.org/planning/resource-utilization/GI_Queue/","updated_at":"2026-10-26T17:26:48Z"},{"id":"GRID-MISO-J4333","iso_rto":"MISO","queue_id":"J4333","project_name":"MISO J4333 — GREAT RIVER ENERGY Substation (Solar / Battery Storage)","developer_or_entity":"GREAT RIVER ENERGY","county":"Regional","state":"TX","substation_or_poi":"GREAT RIVER ENERGY Substation","voltage_kv":345,"capacity_mw":490,"fuel_or_tech_type":"Solar / Battery Storage","status":"Active (Active)","queue_date":"2026-09-03","target_cod":"2031-11-30","upgrade_cost_est_usd":41650000,"transformer_lead_risk":"36-48 Months (345kV-500kV GSU Transformer Bottleneck)","commercial_trigger":"TRANSFORMER BOTTLENECK (24-36M LEAD)","monetize_note":"Utility-scale 490 MW (Solar / Battery Storage) interconnection on 345kV bus — long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).","source_url":"https://www.misoenergy.org/planning/resource-utilization/GI_Queue/","updated_at":"2026-10-26T17:26:48Z"},{"id":"GRID-MISO-J4362","iso_rto":"MISO","queue_id":"J4362","project_name":"MISO J4362 — MISO Transmission Owner Substation (Solar / Battery Storage)","developer_or_entity":"MISO Transmission Owner","county":"Regional","state":"TX","substation_or_poi":"MISO Transmission Owner Substation","voltage_kv":345,"capacity_mw":490,"fuel_or_tech_type":"Solar / Battery Storage","status":"Active (Active)","queue_date":"2026-09-03","target_cod":"2031-11-30","upgrade_cost_est_usd":41650000,"transformer_lead_risk":"36-48 Months (345kV-500kV GSU Transformer Bottleneck)","commercial_trigger":"TRANSFORMER BOTTLENECK (24-36M LEAD)","monetize_note":"Utility-scale 490 MW (Solar / Battery Storage) interconnection on 345kV bus — long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).","source_url":"https://www.misoenergy.org/planning/resource-utilization/GI_Queue/","updated_at":"2026-10-26T17:26:48Z"},{"id":"GRID-NYISO-L-1536","iso_rto":"NYISO","queue_id":"NYISO-L-1536","project_name":"White Pine Phase 1 (NM-NG)","developer_or_entity":"Micron New York Semiconductor Manufacturing LLC","county":"Onondaga","state":"NY","substation_or_poi":"Clay 345 kV Substation","voltage_kv":345,"capacity_mw":480,"fuel_or_tech_type":"Semiconductor Fab Load","status":"Active Load Interconnection","queue_date":"2023-03-11","target_cod":"2027-12-01","upgrade_cost_est_usd":32640000,"transformer_lead_risk":"30-42 Months (345kV/115kV Large Power Transformer)","commercial_trigger":"DATA CENTER / LARGE LOAD INTERCONNECTION","monetize_note":"480 MW large load interconnection at Clay 345 kV Substation (345kV) — developer requires dedicated HV substation step-down transformers, GIS switchgear, and behind-the-meter backup generation.","source_url":"https://www.nyiso.com/interconnections","updated_at":"2026-10-26T17:26:48Z"},{"id":"GRID-DOD-N0002407C4014","iso_rto":"DOD-DOE","queue_id":"N0002407C4014","project_name":"Defense Contract Management Agency: MTG SET","developer_or_entity":"ROLLS-ROYCE CORPORATION","county":"Defense Contract Management Agency","state":"IN","substation_or_poi":"Defense Contract Management Agency (IN)","voltage_kv":138,"capacity_mw":472.9,"fuel_or_tech_type":"DoD/DOE Transformer, Switchgear & Power (FSC 6110/6115/6120)","status":"Active Federal Contract","queue_date":"2025-10-01","target_cod":"2022-09-30","upgrade_cost_est_usd":85128018.5,"transformer_lead_risk":"24-36 Months (HV GSU / Substation Transformer)","commercial_trigger":"DOD BASE MICROGRID / EPC","monetize_note":"Active DoD/DOE power transformer, switchgear, or base microgrid contract — prime is sourcing IEEE C57.12 HV transformers, medium-voltage breakers (FSC 6110), and protective relays.","source_url":"https://www.usaspending.gov/award/CONT_AWD_N0002407C4014_9700_-NONE-_-NONE-","updated_at":"2026-10-26T17:26:48Z"},{"id":"GRID-MISO-J4372","iso_rto":"MISO","queue_id":"J4372","project_name":"MISO J4372 — NORTHERN STATES POWER COMPANY Substation (Solar / Battery Storage)","developer_or_entity":"NORTHERN STATES POWER COMPANY","county":"Regional","state":"TX","substation_or_poi":"NORTHERN STATES POWER COMPANY Substation","voltage_kv":345,"capacity_mw":470,"fuel_or_tech_type":"Solar / Battery Storage","status":"Active (Active)","queue_date":"2026-09-12","target_cod":"2031-12-31","upgrade_cost_est_usd":39950000,"transformer_lead_risk":"36-48 Months (345kV-500kV GSU Transformer Bottleneck)","commercial_trigger":"TRANSFORMER BOTTLENECK (24-36M LEAD)","monetize_note":"Utility-scale 470 MW (Solar / Battery Storage) interconnection on 345kV bus — long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).","source_url":"https://www.misoenergy.org/planning/resource-utilization/GI_Queue/","updated_at":"2026-10-26T17:26:48Z"},{"id":"GRID-NYISO-L-1730","iso_rto":"NYISO","queue_id":"NYISO-L-1730","project_name":"Arsenal Data Site 1000 (NYPA)","developer_or_entity":"Arconic Corporation","county":"St Lawrence","state":"NY","substation_or_poi":"Haverstock to Adirondak 345kV line HA-1","voltage_kv":345,"capacity_mw":467,"fuel_or_tech_type":"Large Load / AI Data Center & Industrial","status":"Active Load Interconnection","queue_date":"2025-03-07","target_cod":"2027-12-01","upgrade_cost_est_usd":31756000,"transformer_lead_risk":"30-42 Months (345kV/115kV Large Power Transformer)","commercial_trigger":"DATA CENTER / LARGE LOAD INTERCONNECTION","monetize_note":"467 MW large load interconnection at Haverstock to Adirondak 345kV line HA-1 (345kV) — developer requires dedicated HV substation step-down transformers, GIS switchgear, and behind-the-meter backup generation.","source_url":"https://www.nyiso.com/interconnections","updated_at":"2026-10-26T17:26:48Z"},{"id":"GRID-NYISO-C260051","iso_rto":"NYISO","queue_id":"C26-0051","project_name":"Gowanus Gas Turbine Facility Repowering (CONED)","developer_or_entity":"Astoria Generating Company, LP","county":"Kings County, Brooklyn","state":"NY","substation_or_poi":"Existing POI at Gowanus 138 kV, between brk # 2N and brk # 4N (42421 & 42423 to 42G13) and between brk # 2S and brk # 5S (42422 & 42424 to 42G24).","voltage_kv":138,"capacity_mw":448,"fuel_or_tech_type":"CT","status":"Active Cluster Study","queue_date":"2026-09-04","target_cod":"2028-06-01","upgrade_cost_est_usd":38080000,"transformer_lead_risk":"36-48 Months (345kV-500kV GSU Transformer Bottleneck)","commercial_trigger":"TRANSFORMER BOTTLENECK (24-36M LEAD)","monetize_note":"Utility-scale 448 MW (CT) interconnection on 138kV bus — long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).","source_url":"https://www.nyiso.com/interconnections","updated_at":"2026-10-26T17:26:48Z"},{"id":"GRID-NYISO-L-0979","iso_rto":"NYISO","queue_id":"NYISO-L-0979","project_name":"North Country Data Center (NYPA)","developer_or_entity":"North Country Data Center","county":"St. Lawrence","state":"NY","substation_or_poi":"Reynolds 115kV","voltage_kv":115,"capacity_mw":435,"fuel_or_tech_type":"Large Load / AI Data Center & Industrial","status":"Active Load Interconnection","queue_date":"2020-01-22","target_cod":"2027-12-01","upgrade_cost_est_usd":29580000,"transformer_lead_risk":"30-42 Months (345kV/115kV Large Power Transformer)","commercial_trigger":"DATA CENTER / LARGE LOAD INTERCONNECTION","monetize_note":"435 MW large load interconnection at Reynolds 115kV (115kV) — developer requires dedicated HV substation step-down transformers, GIS switchgear, and behind-the-meter backup generation.","source_url":"https://www.nyiso.com/interconnections","updated_at":"2026-10-26T17:26:48Z"},{"id":"GRID-MISO-J4389","iso_rto":"MISO","queue_id":"J4389","project_name":"MISO J4389 — MISO Transmission Owner Substation (Solar / Battery Storage)","developer_or_entity":"MISO Transmission Owner","county":"Regional","state":"TX","substation_or_poi":"MISO Transmission Owner Substation","voltage_kv":345,"capacity_mw":430,"fuel_or_tech_type":"Solar / Battery Storage","status":"Active (Active)","queue_date":"2026-09-25","target_cod":"2031-06-30","upgrade_cost_est_usd":36550000,"transformer_lead_risk":"36-48 Months (345kV-500kV GSU Transformer Bottleneck)","commercial_trigger":"TRANSFORMER BOTTLENECK (24-36M LEAD)","monetize_note":"Utility-scale 430 MW (Solar / Battery Storage) interconnection on 345kV bus — long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).","source_url":"https://www.misoenergy.org/planning/resource-utilization/GI_Queue/","updated_at":"2026-10-26T17:26:48Z"},{"id":"GRID-NYISO-C260028","iso_rto":"NYISO","queue_id":"C26-0028","project_name":"Northport Power Station (LIPA)","developer_or_entity":"NGV Northport Energy Center LLC","county":"Suffolk","state":"NY","substation_or_poi":"138 kV Northport Substation","voltage_kv":138,"capacity_mw":427,"fuel_or_tech_type":"CC","status":"Active Cluster Study","queue_date":"2026-08-20","target_cod":"2028-06-01","upgrade_cost_est_usd":36295000,"transformer_lead_risk":"36-48 Months (345kV-500kV GSU Transformer Bottleneck)","commercial_trigger":"TRANSFORMER BOTTLENECK (24-36M LEAD)","monetize_note":"Utility-scale 427 MW (CC) interconnection on 138kV bus — long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).","source_url":"https://www.nyiso.com/interconnections","updated_at":"2026-10-26T17:26:48Z"},{"id":"GRID-NYISO-C260027","iso_rto":"NYISO","queue_id":"C26-0027","project_name":"EF Barrett - 1 (NY Transco)","developer_or_entity":"NGV Barrett Energy Center LLC","county":"Nassau","state":"NY","substation_or_poi":"(New) 345 kV Barrett Propel Substation","voltage_kv":345,"capacity_mw":426.8,"fuel_or_tech_type":"CC","status":"Active Cluster Study","queue_date":"2026-08-18","target_cod":"2028-06-01","upgrade_cost_est_usd":36273750,"transformer_lead_risk":"36-48 Months (345kV-500kV GSU Transformer Bottleneck)","commercial_trigger":"TRANSFORMER BOTTLENECK (24-36M LEAD)","monetize_note":"Utility-scale 426 MW (CC) interconnection on 345kV bus — long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).","source_url":"https://www.nyiso.com/interconnections","updated_at":"2026-10-26T17:26:48Z"},{"id":"GRID-DOD-W909MY23F0078","iso_rto":"DOD-DOE","queue_id":"W909MY23F0078","project_name":"Department of the Army: AMMPS DELIVERY ORDER 21","developer_or_entity":"CUMMINS POWER GENERATION INC.","county":"Department of the Army","state":"MN","substation_or_poi":"Department of the Army (MN)","voltage_kv":138,"capacity_mw":424.1,"fuel_or_tech_type":"DoD/DOE Transformer, Switchgear & Power (FSC 6110/6115/6120)","status":"Active Federal Contract","queue_date":"2023-08-22","target_cod":"2025-12-12","upgrade_cost_est_usd":76335513,"transformer_lead_risk":"24-36 Months (HV GSU / Substation Transformer)","commercial_trigger":"DOD BASE MICROGRID / EPC","monetize_note":"Active DoD/DOE power transformer, switchgear, or base microgrid contract — prime is sourcing IEEE C57.12 HV transformers, medium-voltage breakers (FSC 6110), and protective relays.","source_url":"https://www.usaspending.gov/award/CONT_AWD_W909MY23F0078_9700_W909MY18D0033_9700","updated_at":"2026-10-26T17:26:48Z"},{"id":"GRID-MISO-J4340","iso_rto":"MISO","queue_id":"J4340","project_name":"MISO J4340 — SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SO (Solar / Battery Storage)","developer_or_entity":"SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH","county":"Regional","state":"TX","substation_or_poi":"SOUTHERN INDIANA GAS & ELECTRIC COMPANY D/B/A CENTERPOINT ENERGY INDIANA SOUTH Substation","voltage_kv":345,"capacity_mw":415,"fuel_or_tech_type":"Solar / Battery Storage","status":"Active (Active)","queue_date":"2026-09-09","target_cod":"2030-01-15","upgrade_cost_est_usd":35275000,"transformer_lead_risk":"36-48 Months (345kV-500kV GSU Transformer Bottleneck)","commercial_trigger":"TRANSFORMER BOTTLENECK (24-36M LEAD)","monetize_note":"Utility-scale 415 MW (Solar / Battery Storage) interconnection on 345kV bus — long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).","source_url":"https://www.misoenergy.org/planning/resource-utilization/GI_Queue/","updated_at":"2026-10-26T17:26:48Z"},{"id":"GRID-MISO-J4347","iso_rto":"MISO","queue_id":"J4347","project_name":"MISO J4347 — MIDAMERICAN ENERGY CO. MEC Substation (Solar / Battery Storage)","developer_or_entity":"MIDAMERICAN ENERGY CO. MEC","county":"Regional","state":"TX","substation_or_poi":"MIDAMERICAN ENERGY CO. MEC Substation","voltage_kv":345,"capacity_mw":400,"fuel_or_tech_type":"Solar / Battery Storage","status":"Active (Active)","queue_date":"2026-09-11","target_cod":"2030-01-31","upgrade_cost_est_usd":34000000,"transformer_lead_risk":"36-48 Months (345kV-500kV GSU Transformer Bottleneck)","commercial_trigger":"TRANSFORMER BOTTLENECK (24-36M LEAD)","monetize_note":"Utility-scale 400 MW (Solar / Battery Storage) interconnection on 345kV bus — long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).","source_url":"https://www.misoenergy.org/planning/resource-utilization/GI_Queue/","updated_at":"2026-10-26T17:26:48Z"},{"id":"GRID-NYISO-C260056","iso_rto":"NYISO","queue_id":"C26-0056","project_name":"Brooks Road BESS (RG&E)","developer_or_entity":"Aurora Solar, LLC","county":"Monroe","state":"NY","substation_or_poi":"345 kV S255","voltage_kv":345,"capacity_mw":400,"fuel_or_tech_type":"Battery Energy Storage (BESS)","status":"Active Cluster Study","queue_date":"2026-09-10","target_cod":"2028-06-01","upgrade_cost_est_usd":34000000,"transformer_lead_risk":"36-48 Months (345kV-500kV GSU Transformer Bottleneck)","commercial_trigger":"TRANSFORMER BOTTLENECK (24-36M LEAD)","monetize_note":"Utility-scale 400 MW (Battery Energy Storage (BESS)) interconnection on 345kV bus — long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).","source_url":"https://www.nyiso.com/interconnections","updated_at":"2026-10-26T17:26:48Z"},{"id":"GRID-MISO-J4394","iso_rto":"MISO","queue_id":"J4394","project_name":"MISO J4394 — NORTHERN STATES POWER COMPANY Substation (Solar / Battery Storage)","developer_or_entity":"NORTHERN STATES POWER COMPANY","county":"Regional","state":"TX","substation_or_poi":"NORTHERN STATES POWER COMPANY Substation","voltage_kv":345,"capacity_mw":400,"fuel_or_tech_type":"Solar / Battery Storage","status":"Active (Active)","queue_date":"2026-09-09","target_cod":"2030-08-31","upgrade_cost_est_usd":34000000,"transformer_lead_risk":"36-48 Months (345kV-500kV GSU Transformer Bottleneck)","commercial_trigger":"TRANSFORMER BOTTLENECK (24-36M LEAD)","monetize_note":"Utility-scale 400 MW (Solar / Battery Storage) interconnection on 345kV bus — long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).","source_url":"https://www.misoenergy.org/planning/resource-utilization/GI_Queue/","updated_at":"2026-10-26T17:26:48Z"},{"id":"GRID-MISO-J4370","iso_rto":"MISO","queue_id":"J4370","project_name":"MISO J4370 — NORTHERN STATES POWER COMPANY Substation (Solar / Battery Storage)","developer_or_entity":"NORTHERN STATES POWER COMPANY","county":"Regional","state":"TX","substation_or_poi":"NORTHERN STATES POWER COMPANY Substation","voltage_kv":345,"capacity_mw":400,"fuel_or_tech_type":"Solar / Battery Storage","status":"Active (Active)","queue_date":"2026-09-09","target_cod":"2031-10-09","upgrade_cost_est_usd":34000000,"transformer_lead_risk":"36-48 Months (345kV-500kV GSU Transformer Bottleneck)","commercial_trigger":"TRANSFORMER BOTTLENECK (24-36M LEAD)","monetize_note":"Utility-scale 400 MW (Solar / Battery Storage) interconnection on 345kV bus — long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).","source_url":"https://www.misoenergy.org/planning/resource-utilization/GI_Queue/","updated_at":"2026-10-26T17:26:48Z"},{"id":"GRID-NYISO-C260009","iso_rto":"NYISO","queue_id":"C26-0009","project_name":"Terrapin Storage (ConEd)","developer_or_entity":"Terrapin Storage LLC","county":"Kings","state":"NY","substation_or_poi":"Gowanus 345 kV","voltage_kv":345,"capacity_mw":400,"fuel_or_tech_type":"Battery Energy Storage (BESS)","status":"Active Cluster Study","queue_date":"2026-07-31","target_cod":"2028-06-01","upgrade_cost_est_usd":34000000,"transformer_lead_risk":"36-48 Months (345kV-500kV GSU Transformer Bottleneck)","commercial_trigger":"TRANSFORMER BOTTLENECK (24-36M LEAD)","monetize_note":"Utility-scale 400 MW (Battery Energy Storage (BESS)) interconnection on 345kV bus — long-lead Generator Step-Up (GSU) transformer & high-voltage breaker procurement window open for OEMs ($GEV, $ETN, Hitachi, Siemens).","source_url":"https://www.nyiso.com/interconnections","updated_at":"2026-10-26T17:26:48Z"},{"id":"GRID-NYISO-L-1762","iso_rto":"NYISO","queue_id":"NYISO-L-1762","project_name":"Highwall Data Center (NYSEG)","developer_or_entity":"Highwall Energy, LLC","county":"Clearfield","state":"PA","substation_or_poi":"same POI of Q#1080 (Mineral Basin Solar), connects to NYSEG's L47 line","voltage_kv":345,"capacity_mw":400,"fuel_or_tech_type":"Large Load / AI Data Center & Industrial","status":"Active Load Interconnection","queue_date":"2026-05-12","target_cod":"2027-12-01","upgrade_cost_est_usd":27200000,"transformer_lead_risk":"30-42 Months (345kV/115kV Large Power Transformer)","commercial_trigger":"DATA CENTER / LARGE LOAD INTERCONNECTION","monetize_note":"400 MW large load interconnection at same POI of Q#1080 (Mineral Basin Solar), connects to NYSEG's L47 line (345kV) — developer requires dedicated HV substation step-down transformers, GIS switchgear, and behind-the-meter backup generation.","source_url":"https://www.nyiso.com/interconnections","updated_at":"2026-10-26T17:26:48Z"},{"id":"GRID-NYISO-L-1740","iso_rto":"NYISO","queue_id":"NYISO-L-1740","project_name":"Incremental Load Request for Remington Factory Redevelopment (NYPA)","developer_or_entity":"Turin Management LLC","county":"Herkimer","state":"NY","substation_or_poi":"Line 1: 345KV from EDIC to Fraser. Line 2: 345 KV from Marcy to Coopers Corners","voltage_kv":345,"capacity_mw":400,"fuel_or_tech_type":"Large Load / AI Data Center & Industrial","status":"Active Load Interconnection","queue_date":"2025-08-29","target_cod":"2027-12-01","upgrade_cost_est_usd":27200000,"transformer_lead_risk":"30-42 Months (345kV/115kV Large Power Transformer)","commercial_trigger":"DATA CENTER / LARGE LOAD INTERCONNECTION","monetize_note":"400 MW large load interconnection at Line 1: 345KV from EDIC to Fraser. Line 2: 345 KV from Marcy to Coopers Corners (345kV) — developer requires dedicated HV substation step-down transformers, GIS switchgear, and behind-the-meter backup generation.","source_url":"https://www.nyiso.com/interconnections","updated_at":"2026-10-26T17:26:48Z"}]}